Difference between revisions of "Coil Test Weekly Meeting 17-Jun-2010"

From GlueXWiki
Jump to: navigation, search
m
m
Line 1: Line 1:
 
===Solenoid Coil Test Weekly Meeting===
 
===Solenoid Coil Test Weekly Meeting===
 +
 +
 +
'''Note: short meeting due to Solenoid meeting at 11am'''
 +
  
  
 
'''Location and Time'''
 
'''Location and Time'''
  
* Thu 10-Jun-2010 9:30am ARC 428
+
* Thu 17-Jun-2010 9:30am ARC 428
  
  
 
'''Agenda'''
 
'''Agenda'''
  
* F117 status - Tim, Elliott
+
* F117 status - Elliott
** when must we vacate to make room for others?  shortly after 16-Jul?
+
** PLC testing
** is there enough room now for Fernando et al?
+
** hole in the wall?
** note that hole in wall scheduled for 16-Jul
+
** wiring should be done by 15-Jun, wire testing about a week later
+
** how long does Mark W need test PLC program?
+
 
* B field - George, Floyd
 
* B field - George, Floyd
** what is field at power supply
+
** Field at power supply
*** if too high, move it?  field clamp?
+
** where to place racks?
** where to place controls racks (may not need RS485)?
+
*** cannot handle high fields
+
** where to place computers?
+
*** cannot handle high fields
+
 
* Safety review - Elliott
 
* Safety review - Elliott
 
** 2-Jul meeting date
 
** 2-Jul meeting date
** 23-Jun deadline submit writing assignments to me (Elton thinks I'll need more time)
+
** 23-Jun deadline submit writing assignments to me
 
** 25-Jun submit documents to committee
 
** 25-Jun submit documents to committee
 
** writing assignments (SME):
 
** writing assignments (SME):
Line 31: Line 28:
 
*** Cody - magnet power (Bill Merz)
 
*** Cody - magnet power (Bill Merz)
 
*** Elliott - controls (Steve L)
 
*** Elliott - controls (Steve L)
** also need coil test plan from George and Josh, list of previous reviews
+
** list of previous reviews
 
* Coil test plan - Josh
 
* Coil test plan - Josh
 
* Magnet power supply commissioning - Cody
 
* Magnet power supply commissioning - Cody
 +
** status
 
** dump resistor
 
** dump resistor
 
** magnetic field
 
** magnetic field

Revision as of 13:36, 16 June 2010

Solenoid Coil Test Weekly Meeting

Note: short meeting due to Solenoid meeting at 11am


Location and Time

  • Thu 17-Jun-2010 9:30am ARC 428


Agenda

  • F117 status - Elliott
    • PLC testing
    • hole in the wall?
  • B field - George, Floyd
    • Field at power supply
    • where to place racks?
  • Safety review - Elliott
    • 2-Jul meeting date
    • 23-Jun deadline submit writing assignments to me
    • 25-Jun submit documents to committee
    • writing assignments (SME):
      • George - pressure (Steve L), large mechanical structures (John K and/or Suresh), B field (Jennifer W)
      • Josh - ODH (Mat), cryo supply (Mat), cryo devices (Mat)
      • Cody - magnet power (Bill Merz)
      • Elliott - controls (Steve L)
    • list of previous reviews
  • Coil test plan - Josh
  • Magnet power supply commissioning - Cody
    • status
    • dump resistor
    • magnetic field
  • EPICS <--> PLC communications - Wesley
  • Relay cards (for open collector outputs) - Cody
  • Controls racks - Mark W, Scot
    • wiring diagram update
  • PLC programming status - Mark W
  • HMI and EWEB programming - Yi, Elliott
  • Printer, laptop - Elliott
  • Installation status - George
  • Coil repair status - George
  • DOE mandated coil replacement plan status - George, Elliott