Line 36: | Line 36: | ||
** dump resistor | ** dump resistor | ||
** magnetic field | ** magnetic field | ||
− | |||
* EPICS <--> PLC communications - Wesley | * EPICS <--> PLC communications - Wesley | ||
− | * | + | * Relay cards (for open collector outputs) - Cody |
− | + | * Controls racks - Mark W, Scot | |
− | + | ** wiring diagram update | |
− | + | ||
− | * | + | |
− | + | ||
− | ** | + | |
− | + | ||
− | + | ||
− | + | ||
* PLC programming status - Mark W | * PLC programming status - Mark W | ||
− | |||
* HMI and EWEB programming - Yi, Elliott | * HMI and EWEB programming - Yi, Elliott | ||
− | * | + | * Printer, laptop - Elliott |
− | + | ||
− | + | ||
− | + | ||
* Installation status - George | * Installation status - George | ||
* Coil repair status - George | * Coil repair status - George | ||
* DOE mandated coil replacement plan status - George, Elliott | * DOE mandated coil replacement plan status - George, Elliott |
Revision as of 13:30, 16 June 2010
Solenoid Coil Test Weekly Meeting
Location and Time
- Thu 10-Jun-2010 9:30am ARC 428
Agenda
- F117 status - Tim, Elliott
- when must we vacate to make room for others? shortly after 16-Jul?
- is there enough room now for Fernando et al?
- note that hole in wall scheduled for 16-Jul
- wiring should be done by 15-Jun, wire testing about a week later
- how long does Mark W need test PLC program?
- B field - George, Floyd
- what is field at power supply?
- if too high, move it? field clamp?
- where to place controls racks (may not need RS485)?
- cannot handle high fields
- where to place computers?
- cannot handle high fields
- what is field at power supply?
- Safety review - Elliott
- 2-Jul meeting date
- 23-Jun deadline submit writing assignments to me (Elton thinks I'll need more time)
- 25-Jun submit documents to committee
- writing assignments (SME):
- George - pressure (Steve L), large mechanical structures (John K and/or Suresh), B field (Jennifer W)
- Josh - ODH (Mat), cryo supply (Mat), cryo devices (Mat)
- Cody - magnet power (Bill Merz)
- Elliott - controls (Steve L)
- also need coil test plan from George and Josh, list of previous reviews
- Coil test plan - Josh
- Magnet power supply commissioning - Cody
- dump resistor
- magnetic field
- EPICS <--> PLC communications - Wesley
- Relay cards (for open collector outputs) - Cody
- Controls racks - Mark W, Scot
- wiring diagram update
- PLC programming status - Mark W
- HMI and EWEB programming - Yi, Elliott
- Printer, laptop - Elliott
- Installation status - George
- Coil repair status - George
- DOE mandated coil replacement plan status - George, Elliott