− | - Bill | + | - We discussed only the production planning. Bill with the help of Chuck put the cathode production on the FastTrack. When a pdf version will be available it will be linked to the minutes of this meting. The production of one cathode sandwich (cathode and ground planes) will take about four days with five people: four techs cutting, gluing, stretching the foil and one electrical tech doing the soldering work. The second type of cathode sandwich doesn't have a ground plane which makes it by a half day faster, but if assuming the same time we will have 8 days per chamber layer or for 30 layers, 240 days in total. |
− | + | ||
− | - | + | <!-- |
− | + | ||
− | - | + | |
== Electronics == | == Electronics == |
Revision as of 17:38, 10 June 2010
June 10, 2010 FDC meeting
Tentative Agenda
- Production
- 727 B.C. status
- production planning
- wire stringing
- tension measurement system
- Electronics
- fADC125 status (Gerard, Fernando)
- noise/grounding investigations (Fernando)
- Cathode redesign Bill's changes proposed on the last meeting (Bill, Roger)
- Full-scale prototype tests
- cosmics tests FDC Log Book, page 478 - 482 (Beni)
- new tests with fADC125 (Lubomir)
- Other
Minutes
Participants: Bill, Casey, Glenn, Roger, Beni, Chuck, Fernando, Simon, and Lubomir
Production
- We discussed only the production planning. Bill with the help of Chuck put the cathode production on the FastTrack. When a pdf version will be available it will be linked to the minutes of this meting. The production of one cathode sandwich (cathode and ground planes) will take about four days with five people: four techs cutting, gluing, stretching the foil and one electrical tech doing the soldering work. The second type of cathode sandwich doesn't have a ground plane which makes it by a half day faster, but if assuming the same time we will have 8 days per chamber layer or for 30 layers, 240 days in total.