'''Agenda'''
 
'''Agenda'''
  
 +
* Coil test schedule - all
 +
* Safety review update - Elliott
 +
** 2-Jul preliminary meeting date
 +
** 24-Jun deadline for writing assignments
 
* Coil test plan - George, Josh
 
* Coil test plan - George, Josh
* DOE: new soleniod vs new coils and Helium vessels - George
 
 
* Update on safety interlock design - Mark S, Scot
 
* Update on safety interlock design - Mark S, Scot
** changes to fast and slow dump circuits
+
** fast and slow dump circuits
 
** redundancy in power supply overcurrent interlock
 
** redundancy in power supply overcurrent interlock
* Update on magnet power supply commissioning - Cody
+
* Magnet power supply commissioning - Cody
 +
** dump resistor
 +
** magnetic field
 +
** upgrade to higher current
 
* Update on EPICS <--> PLC communications - Wesley
 
* Update on EPICS <--> PLC communications - Wesley
 
* Magnetic field near control racks and computers - George
 
* Magnetic field near control racks and computers - George
* Safety review - OSP and COO - Elliott, Josh, Tim
+
* Final A-B equipment order - Elliott
** meeting with Bob May et al. next week
+
* Final (I hope) A-B equipment order - Elliott
+
** RS232 module, 4-chan 4-20 mA output module, two carriers
+
 
* Wiring and testing controls racks - Scot
 
* Wiring and testing controls racks - Scot
 
** how do we test the system in F117?
 
** how do we test the system in F117?
 
** when does the PLC need to move to F117?
 
** when does the PLC need to move to F117?
** can Wesley and Cody play a major role in commissioning the control system?
 
** can we use the power supply analog current output signal?
 
 
* PLC programming status - Mark W
 
* PLC programming status - Mark W
 
** C-glass calibrations - George
 
** C-glass calibrations - George
* RS485 vs RS422 - Mark W, Elliott
 
 
* HMI and EWEB programming - Yi, Elliott
 
* HMI and EWEB programming - Yi, Elliott
** offsite visibility of EWEB pages
 
 
* Installation status - George
 
* Installation status - George
 
* Coil repair status - George
 
* Coil repair status - George

Revision as of 16:42, 2 June 2010

Solenoid Coil Test Weekly Meeting

Location and Time

  • Thu 3-Jun-2010 9:30am ARC 428


Agenda

  • Coil test schedule - all
  • Safety review update - Elliott
    • 2-Jul preliminary meeting date
    • 24-Jun deadline for writing assignments
  • Coil test plan - George, Josh
  • Update on safety interlock design - Mark S, Scot
    • fast and slow dump circuits
    • redundancy in power supply overcurrent interlock
  • Magnet power supply commissioning - Cody
    • dump resistor
    • magnetic field
    • upgrade to higher current
  • Update on EPICS <--> PLC communications - Wesley
  • Magnetic field near control racks and computers - George
  • Final A-B equipment order - Elliott
  • Wiring and testing controls racks - Scot
    • how do we test the system in F117?
    • when does the PLC need to move to F117?
  • PLC programming status - Mark W
    • C-glass calibrations - George
  • HMI and EWEB programming - Yi, Elliott
  • Installation status - George
  • Coil repair status - George