Difference between revisions of "Tagged Beam Group Engineering Drawings"
From GlueXWiki
(→Tagging Spectrometer) |
(→Tagging Spectrometer) |
||
Line 1: | Line 1: | ||
==Tagging Spectrometer== | ==Tagging Spectrometer== | ||
− | |||
* [http://www.jlab.org/~whitey/TAGGER/TAGGER_section1.pdf Tagger magnet and chamber section 1 July, 30, 2008] - ''July 30, 2008'' | * [http://www.jlab.org/~whitey/TAGGER/TAGGER_section1.pdf Tagger magnet and chamber section 1 July, 30, 2008] - ''July 30, 2008'' | ||
* [http://www.jlab.org/~whitey/TAGGER/TAGGER_section2.pdf Tagger magnet and chamber section 2 July, 30, 2008] - ''July 30, 2008'' | * [http://www.jlab.org/~whitey/TAGGER/TAGGER_section2.pdf Tagger magnet and chamber section 2 July, 30, 2008] - ''July 30, 2008'' |
Revision as of 14:37, 1 June 2010
Contents
Tagging Spectrometer
- Tagger magnet and chamber section 1 July, 30, 2008 - July 30, 2008
- Tagger magnet and chamber section 2 July, 30, 2008 - July 30, 2008
- Tagger magnet Cross section from Yang Tosca Sept 10, 2008
- Tagger magnet modified Cross section from Yang Tosca Sept 26, 2008
- Tagger magnet critical interfaces Sht 2 Feb 23, 2009
- Tagger magnet critical interfaces sht 1 FEB 23, 2009
- Tagger hall Quad magnet sht 1
- Tagger hall Quad magnet sht 2
- 35% drawing by IHEP provided in April/May 2007
- Statement of Work for the 100% engineering drawings
- Tagger interface drawing
- Standard Beamline Quadrupole Specification
- Tagger Preliminary drawings 10May10
- Tagger magnet prelim spec May 2010
Broadband Tagger Hodoscope
- 35% drawings produced by Catholic Univ. (5/2007)
Tagger Microscope
Active Collimator
- 100% drawings produced by Univ. of Connecticut (6/2006)
Tagger Hall
- Civil design produced by engineering firm for JLab (10/2007)
Collimator Cave
- Conceptual design of shielding plan from Connecticut (5/2006)
- Civil design produced by engineering firm for JLab (10/2007)
- Collimator Cave Layout Aug 20, 2008 - Aug 20, 2008
- Collimator Cave Isometric Jul 18, 2008 - July 18, 2008