Difference between revisions of "BLTWG Meeting 04/19/2010"

From GlueXWiki
Jump to: navigation, search
 
(Agenda)
Line 5: Line 5:
  
 
===Agenda===
 
===Agenda===
# Instrumentation options for the pair spectrometer -- ''Liping''
+
# <i>postponed</i> -- Instrumentation options for the pair spectrometer -- ''Liping''
 
# Status of final design specifications for the tagger -- ''Tim''
 
# Status of final design specifications for the tagger -- ''Tim''
 
# Creating magnetic field tables from ANSYS -- ''Alex''
 
# Creating magnetic field tables from ANSYS -- ''Alex''

Revision as of 09:29, 19 April 2010

  • Time: 11:00 EST
  • Place: ESNET and EVO (with telephone bridge)
  • Connecting: instructions are here
  • Present:

Agenda

  1. postponed -- Instrumentation options for the pair spectrometer -- Liping
  2. Status of final design specifications for the tagger -- Tim
  3. Creating magnetic field tables from ANSYS -- Alex
  4. Progress on diamond procurement, laser ablation -- Richard
  5. Incorporating cable attenuation into tagger rate study -- Richard
  6. Beam test planning -- Igor

Notes