April 8, 2010 FDC meeting
Tentative Agenda
- Off-site production space
- status
- requirements, floor plan
- Electronics (Fernando)
- finalizing PCB design
- cable procurement
- Cathode redesign (Bill, Roger)
- Redesigned frame prototype
- plans for tests
- Full scale prototype (Beni)
- two-layer HV tests
- plans for the third layer
- preparation for cosmics tests
- Other