Difference between revisions of "Minutes-3-25-2010"
From GlueXWiki
Line 4: | Line 4: | ||
= Tentative Agenda = | = Tentative Agenda = | ||
− | # Production space update | + | # Production space update [http://www.jlab.org/Hall-D/detector/fdc/general/ off-site floor plans] |
# Electronics | # Electronics | ||
#* threshold variations in the discriminator section of the pre-amps (Fernando) | #* threshold variations in the discriminator section of the pre-amps (Fernando) |
Revision as of 23:53, 24 March 2010
March 25, 2010 FDC meeting
Tentative Agenda
- Production space update off-site floor plans
- Electronics
- threshold variations in the discriminator section of the pre-amps (Fernando)
- PCB status
- Frame modification work
- cathode sandwich and wire frame
- ground plane tests (leakage, tension)
- Wire winding update
- IUCF phase 3 contract
- plans for wire winding upgrades in the summer
- tension specs
- Full scale prototype tests
- lessons learned from the HV tests
- plans for tests in the tend
- some results from the tests with Sr source FDC Log Book (Lubomir)
- Cathode frame redesign
- MC studies of the beam hole size (Alex)
- Other
- wire sample measurements wire sample reports
- updated FDC naming convention naming convention