* Do we have enough ControlNet and/or Ethernet/IP modules? - Elliott, Scot
 
* Status of PLC programming - Mark W
 
* Status of PLC programming - Mark W
 
* A-B EWEB module for web access ([http://www.jlab.org/~wolin/sample.html example page])- Elliott
 
* A-B EWEB module for web access ([http://www.jlab.org/~wolin/sample.html example page])- Elliott
* Power narrative to Mark W - George
+
* Finalizing P&I diagram, including machine protection systems - George, Josh, Scot, Elliott
* Finalizing P&I diagram - George, Elliott
+
* Final narrative including cryo, power and machine protection to Mark W - George
 +
* Install Point I/O system in ARC 101 - Elliott
 
* What controls equipment still hasn't arrived - Scot
 
* What controls equipment still hasn't arrived - Scot
 
* Wiring progress in F117 - Scot
 
* Wiring progress in F117 - Scot
 +
* A-B keyed terminal blocks - Elliott
 +
* Ethernet/IP only A-B control system - Elliott
 
* FastTrack schedule status - George, Chuck
 
* FastTrack schedule status - George, Chuck
 
* Status of controls drawings and wiring lists - Scot
 
* Status of controls drawings and wiring lists - Scot
 
* Coil 1 cryostat testing status - George
 
* Coil 1 cryostat testing status - George
 
* Construction/installation sequence drawings - George
 
* Construction/installation sequence drawings - George
 +
* Status of interface to cryo can - George
 +
* Status of pressure relief system design - George
 +
* Coil 1 status - George
 +
* Coil 2 cost and schedule - George
 +
* Coil 3 statement of work, visit and IUCF contract - George, Tom
 +
* Coil 4 controls wiring replacement - George
 +
* Shipping rails and transportainer from IUCF - Chuck
 
* Arrange for electrical work in Test Lab - Tom
 
* Arrange for electrical work in Test Lab - Tom
 
* Arrange for telecom in Test Lab - Elliott
 
* Arrange for telecom in Test Lab - Elliott
Line 26: Line 37:
 
* Locating computer in SRF control room - Elliott
 
* Locating computer in SRF control room - Elliott
 
* Backup computer - Elliott
 
* Backup computer - Elliott
* Status of interface to cryo can - George
 
* Status of pressure relief system design - George
 
* Coil 1 modification and testing - George
 
* Coil 2 cost and schedule - George
 
* Coil 3 statement of work, visit and IUCF contract - George, Tom
 
* Coil 4 controls wiring replacement - George
 
* Shipping rails and transportainer from IUCF - Chuck
 
 
* Safety reviews:  when to start formal process - George, Elliott
 
* Safety reviews:  when to start formal process - George, Elliott
 
* 5 G contours - George
 
* 5 G contours - George
 
* Coil Test [[Solenoid_Coil_Test | Top To-Do items]]
 
* Coil Test [[Solenoid_Coil_Test | Top To-Do items]]

Latest revision as of 16:47, 13 January 2010

Solenoid Coil Test Weekly Meeting

Location and Time

  • Thu 14-Jan-2010 9:45 am ARC 428


Agenda

  • Do we have enough ControlNet and/or Ethernet/IP modules? - Elliott, Scot
  • Status of PLC programming - Mark W
  • A-B EWEB module for web access (example page)- Elliott
  • Finalizing P&I diagram, including machine protection systems - George, Josh, Scot, Elliott
  • Final narrative including cryo, power and machine protection to Mark W - George
  • Install Point I/O system in ARC 101 - Elliott
  • What controls equipment still hasn't arrived - Scot
  • Wiring progress in F117 - Scot
  • A-B keyed terminal blocks - Elliott
  • Ethernet/IP only A-B control system - Elliott
  • FastTrack schedule status - George, Chuck
  • Status of controls drawings and wiring lists - Scot
  • Coil 1 cryostat testing status - George
  • Construction/installation sequence drawings - George
  • Status of interface to cryo can - George
  • Status of pressure relief system design - George
  • Coil 1 status - George
  • Coil 2 cost and schedule - George
  • Coil 3 statement of work, visit and IUCF contract - George, Tom
  • Coil 4 controls wiring replacement - George
  • Shipping rails and transportainer from IUCF - Chuck
  • Arrange for electrical work in Test Lab - Tom
  • Arrange for telecom in Test Lab - Elliott
  • Arrange for networking in Test Lab - Elliott
  • GN2 vent piping system - Tom
  • QWeak area, bigger door in F117 - Tom
  • Locating computer in SRF control room - Elliott
  • Backup computer - Elliott
  • Safety reviews: when to start formal process - George, Elliott
  • 5 G contours - George