Difference between revisions of "July 17, 2009 CDC Meeting"
From GlueXWiki
Line 20: | Line 20: | ||
#Action Items/Decisions | #Action Items/Decisions | ||
+ | * Discussed high prices for tight tolerance components | ||
* Checked IDEAL tool and manufacturing in Chicago. No listing | * Checked IDEAL tool and manufacturing in Chicago. No listing | ||
* Tim to discuss with vendor repair of end plates if hole messed up | * Tim to discuss with vendor repair of end plates if hole messed up |
Revision as of 16:07, 17 July 2009
Meeting Time and Place
Friday July 17, 2009 at 2:30pm At Jefferson Lab, the meeting will be held in room ARC 428
Connections
To connect from the outside, please use ESNET
1.) ESNET: 8542553
2.) Phone:
+1-800-377-8846 : US
+1-888-276-7715 : Canada
+1-302-709-8424 : International
then enter participant code: 77438230# (remember the "#")
Agenda
- CDC Hardware costs Costs
Minutes
- Action Items/Decisions
- Discussed high prices for tight tolerance components
- Checked IDEAL tool and manufacturing in Chicago. No listing
- Tim to discuss with vendor repair of end plates if hole messed up
- Carnegie Mellon to use GARFIELD to check electric field around crimp pin insert
- CMU to look over to see if piece tolerances can be loosened to ± .001 in
- OK if we open end plate to .005 tolerance on hole positions, need to reduce straw diameter to prevent interferences
- Conductive rubber tubes cover 30% of gas holes - ok
- Add holes for 1/4 inch survey balls in top downstream plete to match upstream (2 at 90°)
- CMU to send list of glues
- JLAB to specify glue for rohacel to mylar joint