Difference between revisions of "BLTWG Meeting 06/29/2009"
From GlueXWiki
(→Agenda) |
|||
Line 2: | Line 2: | ||
* Place: EVO and ESNET (with telephone bridge) | * Place: EVO and ESNET (with telephone bridge) | ||
* Connecting: instructions are [[Tagged Beam Group Biweekly Meetings|here]] | * Connecting: instructions are [[Tagged Beam Group Biweekly Meetings|here]] | ||
− | * Present: R. Jones, Alex S., P. Androzewicz, E. Minges, and T. Whitlatch. | + | * Present: R. Jones, Alex S., P. Androzewicz, E. Minges, E. Chudakov, and T. Whitlatch. |
Revision as of 12:02, 29 June 2009
- Time: 11:00 EST
- Place: EVO and ESNET (with telephone bridge)
- Connecting: instructions are here
- Present: R. Jones, Alex S., P. Androzewicz, E. Minges, E. Chudakov, and T. Whitlatch.
Agenda
- Preparation for the internal tagger review - Tim
- Meeting with BNL diamond working group - Richard
- Microscope prototype progress report from UConn - Richard
- Plans for pair spectrometer magnet work - Erik
- Simulations update + cave backgrounds - Sasha
- Funding needs for diamond work + other - discussion
- Discussion of ideas for MRI proposal - discussion
- Tasks to complete before Lehmann Review - discussion
- Progress on MOU's - discussion
Notes
- The following plans were presented by the University of North Carolina (UNCW) group led by L. Gan:
- collaborate with BNL to bring a 30D72 magnet on loan from BNL to Jlab.
- coordinate an engineering effort to modify the gap size of the magnet in order to fit the experimental configuration.
- conduct Monte Carlo simulation for the Pair Spectrometer detector design.
- develop and construct Pair Spectrometer detectors.
- participate in the Pair Spectrometer detector testing, installation, commissioning, calibration and maintenance.