Difference between revisions of "Solenoid Coil Test in Test Lab"
From GlueXWiki
m |
m |
||
Line 2: | Line 2: | ||
− | + | ===Test Area=== | |
* Notes: | * Notes: | ||
Line 13: | Line 13: | ||
** Need come-alongs and anchors to move yokes and coils along rails. | ** Need come-alongs and anchors to move yokes and coils along rails. | ||
− | * To Do: | + | * '''To Do:''' |
** Look into getting space in adjacent areas - George | ** Look into getting space in adjacent areas - George | ||
** Look into possibility of locating computer in control room - Elliott | ** Look into possibility of locating computer in control room - Elliott | ||
Line 30: | Line 30: | ||
− | + | ===Infrastructure=== | |
* Notes: | * Notes: | ||
− | * To Do: | + | * '''To Do:''' |
− | + | ===Components=== | |
* Notes: | * Notes: | ||
− | * To Do: | + | * '''To Do:''' |
− | + | ===Staging=== | |
* Notes: | * Notes: | ||
Line 50: | Line 50: | ||
** Will instrument for final 4-coil system. | ** Will instrument for final 4-coil system. | ||
− | * To Do: | + | * '''To Do:''' |
** Rearrange F117 - Mark S and Beni | ** Rearrange F117 - Mark S and Beni | ||
** Get and move 3 racks into F117 - Mark S | ** Get and move 3 racks into F117 - Mark S | ||
− | + | ===Reviews=== | |
* Notes: | * Notes: | ||
** Micro-review of PLC vendor choice completed, waiting for report. | ** Micro-review of PLC vendor choice completed, waiting for report. | ||
− | * To Do: | + | * '''To Do:''' |
** Write thank-you letter to Jonathan Creel and Omar Garza for participating in PLC vendor review. | ** Write thank-you letter to Jonathan Creel and Omar Garza for participating in PLC vendor review. |
Revision as of 14:02, 18 June 2009
Notes and to-do lists for the solenoid coil tests this summer and fall.
Test Area
- Notes:
- Area in the test lab is 20'6" x 25'9", currently filled with coils and coil parts.
- May be able to get space in adjacent area (QWeak construction and SRF cavity storage areas).
- May need extra space for large power supply (6' x 5') and to avoid placing controls racks in large B field.
- Must maintain clear areas around racks and power supply, and cannot block pedestrian walkways.
- Platform is 172" x 160", cryo can will sit on top.
- Area has two cranes, but need both (and spreader bar) to lift heaviest yoke (45 tons).
- Need come-alongs and anchors to move yokes and coils along rails.
- To Do:
- Look into getting space in adjacent areas - George
- Look into possibility of locating computer in control room - Elliott
- Distribute Floyd's B field map for single coil, no cladding - George
- Determine location of all components - Wayne
- Arrange for piping designer - George
- Design piping to vent N2.
- Design warm and cold He supply/return systems, LN2 supply system.
- Investigate sensitivity of electronic equipment to B fields - Elliott
- Verify we have all cryo transfer lines and U-tubes - Mark S
- Verify we can borrow heat exchanger from Hall A - George
- Order warm He and N2 piping - ?
- Retrieve rails from IU - ?
Infrastructure
- Notes:
- To Do:
Components
- Notes:
- To Do:
Staging
- Notes:
- Will instrument controls racks in F117, then move to Test Lab.
- Will instrument for final 4-coil system.
- To Do:
- Rearrange F117 - Mark S and Beni
- Get and move 3 racks into F117 - Mark S
Reviews
- Notes:
- Micro-review of PLC vendor choice completed, waiting for report.
- To Do:
- Write thank-you letter to Jonathan Creel and Omar Garza for participating in PLC vendor review.