Line 4: | Line 4: | ||
* ECAL maintenance and performance during the run | * ECAL maintenance and performance during the run | ||
+ | ** ECAL scalers before the accelerator maintenance day [https://logbooks.jlab.org/entry/4357287] | ||
+ | ** Checking ECAL modules [https://logbooks.jlab.org/entry/4358085] | ||
** Issue with the FCAL HV module [https://logbooks.jlab.org/entry/4350038] | ** Issue with the FCAL HV module [https://logbooks.jlab.org/entry/4350038] | ||
** Flash ADC scalers during first beam [https://logbooks.jlab.org/entry/4350255] | ** Flash ADC scalers during first beam [https://logbooks.jlab.org/entry/4350255] | ||
Line 14: | Line 16: | ||
** ECAL/FCAL energy and timing [https://logbooks.jlab.org/entry/4352404] | ** ECAL/FCAL energy and timing [https://logbooks.jlab.org/entry/4352404] | ||
** ECAL coverage with 2-arm Compton [https://userweb.jlab.org/~andrsmit/files/ECAL/04_11_2025/ecal_compton_coverage.pdf] | ** ECAL coverage with 2-arm Compton [https://userweb.jlab.org/~andrsmit/files/ECAL/04_11_2025/ecal_compton_coverage.pdf] | ||
+ | ** Pi0 calibration [https://halldweb.jlab.org/primexd/ecal-cal/2025-01/] | ||
* Monitoring | * Monitoring | ||
* Restoring PS test setup [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/08_09_2024/ps_setup.jpg] | * Restoring PS test setup [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/08_09_2024/ps_setup.jpg] | ||
** Assembling PS prototype [https://halldweb.jlab.org/wiki/index.php/PS_test_setup] | ** Assembling PS prototype [https://halldweb.jlab.org/wiki/index.php/PS_test_setup] | ||
+ | |||
+ | =Minutes= | ||
+ | Attendees: Sasha, Bill, Yuyao, Olga, Drew, Besha, Vlad, Payton, Axel, Jane, Igal, S.T. | ||
+ | * ECAL HV has been updated using Compton events | ||
+ | ** Individual HV settings for 146 modules | ||
+ | ** Increased HV for most channels | ||
+ | ** Set energy scale for FADC: 2.8 MeV/ADC count | ||
+ | * Maintenance day: used LMS to check detector | ||
+ | ** Found and fixed one hot channel and a couple other suspicious channels | ||
+ | * Trigger timing between ECAL and FCAL has been adjusted | ||
+ | * π0 calibrations under way | ||
+ | ** π0 peaks clearly seen in most channels, but not seen for ~10% of ECAL channels | ||
+ | ** Trying to understand missing peaks -- scalers look good, baselines are fine, not trigger problem... | ||
+ | ** New simplified peak fitting procedure | ||
+ | ** TOF not properly in time, needed for veto |
Latest revision as of 14:53, 21 April 2025
Meeting time and location:
- 9:30 am EST (JLab time) remote only
- Connection information
- ECAL maintenance and performance during the run
- ECAL scalers before the accelerator maintenance day [1]
- Checking ECAL modules [2]
- Issue with the FCAL HV module [3]
- Flash ADC scalers during first beam [4]
- Two modules fixed during the accelerator maintenance day [5]
- ECAL scalers after maintenance day (production at 100 nA on 4.5x10^-4 Al radiator) [6]
- Commissioning of the ECAL trigger [7] [8]
- Issues with the readout crate during two first two production nights [9]
- Calibrations
- Monitoring
- Restoring PS test setup [14]
- Assembling PS prototype [15]
Minutes
Attendees: Sasha, Bill, Yuyao, Olga, Drew, Besha, Vlad, Payton, Axel, Jane, Igal, S.T.
- ECAL HV has been updated using Compton events
- Individual HV settings for 146 modules
- Increased HV for most channels
- Set energy scale for FADC: 2.8 MeV/ADC count
- Maintenance day: used LMS to check detector
- Found and fixed one hot channel and a couple other suspicious channels
- Trigger timing between ECAL and FCAL has been adjusted
- π0 calibrations under way
- π0 peaks clearly seen in most channels, but not seen for ~10% of ECAL channels
- Trying to understand missing peaks -- scalers look good, baselines are fine, not trigger problem...
- New simplified peak fitting procedure
- TOF not properly in time, needed for veto