Difference between revisions of "FCAL2 Readiness Review"

From GlueXWiki
Jump to: navigation, search
(Documentation)
 
(47 intermediate revisions by 6 users not shown)
Line 5: Line 5:
 
'''Date: February 14, 2025'''
 
'''Date: February 14, 2025'''
  
'''Time: 10 am EST'''
+
'''Time: 9 am EST'''
  
'''Room: Video conference using BlueJeans  '''
+
'''Room: L102 (CEBAF center) '''
 +
*For remote connections: [https://halldweb.jlab.org/wiki-private/index.php/JEF_Weekly_Meeting#Connection_information Zoom Meeting Connection information]
  
''' [https://halldweb.jlab.org/wiki-private/index.php/JEF_Weekly_Meeting#Connection_information Zoom Meeting Connection information]'''
 
  
 
+
''' Experiments:'''  E12-12-002 and E12-12-002A  
== ''' Experiments: E12-12-002 and E12-12-002A''' ==
+
  
  
Line 20: Line 19:
 
<!-- [[Media:ERR_Response_ver2_axel_comments.docx | ERR Response]] -->
 
<!-- [[Media:ERR_Response_ver2_axel_comments.docx | ERR Response]] -->
  
'''Committee members:''' Stepan Stepanyan, Patrizia Rossi, Ed Folts, Neville Malabre-O'Sullivan
+
'''Committee members:''' Stepan Stepanyan (chair), Sergey Boyarinov (DAQ/Trigger), Patrizia Rossi, Ed Folts, Neville Malabre-O'Sullivan
 
+
  
 
=='''ERR Agenda '''==
 
=='''ERR Agenda '''==
  
9:00-9:15: Executive session
+
8:45-9:00: Executive session
  
9:15-9:55: "Status of the ECAL installation and commissioning'' (35+5) A. Somov  (addressing charges 1, 2, 3, 5, and 6)
+
9:00-9:45: [https://halldweb.jlab.org/detectors/fcal2/fcal2_review/ecal_err.pptx  Status of the ECAL commissioning(25+20) A. Somov  (addressing charges 1, 2, 3, 5, and 6)  
  
9:55-10:20: "Status of the LG testing" (20+5) M. Albrecht (addressing charges 1 and 6)
+
9:45-10:15: [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=6726  Status of the FCAL part]  (15+15) M. Albrecht (addressing charges 1, 3, and 6)
  
10:20-10:40: "Engineering design of the detector frame and cooling system'' (15+5)  T. Whitlatch  (addressing charge 2)
+
10:15-10:30 Coffee break
  
10:40-11:00: "Integration of the ECAL into the GlueX framework" (15+5) A. Somov      (addressing charges 4)
+
10:30-11:00: [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=6730 Engineering design of the detector frame and cooling system] (15+15) T. Whitlatch  (addressing charge 2)
  
11:00-11:30: "Shower reconstruction and FCAL2 detector calibration" (25+5) S. Taylor  (addressing charged 5)  
+
11:00-11:30: [https://halldweb.jlab.org/detectors/fcal2/fcal2_review/ecal_trigger.pptx "Integration of the ECAL into the GlueX framework] (15+15) A. Somov      (addressing charge 4)
  
11:30-11:50: Executive session
+
11:30-12:00: [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=6723 Shower reconstruction and FCAL2 detector calibration] (15+15) S. Taylor  (addressing charge 5)
  
11:50: Closeout
+
12:00-12:30 (tentative) : Executive session
 +
 
 +
12:30: (tentative) Closeout
  
 
== '''Documentation''' ==
 
== '''Documentation''' ==
Line 54: Line 54:
 
* [https://halldweb.jlab.org/detectors/fcal2/fcal2_review/doc/RSAD.pdf RSAD]
 
* [https://halldweb.jlab.org/detectors/fcal2/fcal2_review/doc/RSAD.pdf RSAD]
  
== Supplementary Material ==
+
* JLab-PTW-3811 Maintenance of the GlueX trigger system [https://halldweb.jlab.org/detectors/fcal2/fcal2_review/doc/ePAS_3811.pdf][https://halldweb.jlab.org/detectors/fcal2/fcal2_review/doc/ePAS_3811_checklist.pdf]
 +
 
 +
* JLab-PTW-5236 Maintenance of the Hall D ECAL [https://halldweb.jlab.org/detectors/fcal2/fcal2_review/doc/ePAS_5236.pdf][https://halldweb.jlab.org/detectors/fcal2/fcal2_review/doc/ePAS_5236_checklist.pdf]
 +
 
 +
* JLab-PTW-6092 Maintenance of the FCAL2 lead glass part [https://halldweb.jlab.org/detectors/fcal2/fcal2_review/doc/ePAS_6092.pdf][https://halldweb.jlab.org/detectors/fcal2/fcal2_review/doc/ePAS_6092_checklist.pdf]
 +
 
 +
== '''Supplementary Material''' ==
  
  
Line 64: Line 70:
  
  
== [https://halldweb.jlab.org/wiki/index.php/JEF_Meetings '''JEF Working Group Weekly Meetings'''] ==
+
*  [https://halldweb.jlab.org/wiki/index.php/JEF_Meetings JEF Working Group Weekly Meetings]
 +
 
 +
<!-- == [https://halldweb.jlab.org/wiki/index.php/JEF_Meetings '''JEF Working Group Weekly Meetings'''] == -->

Latest revision as of 13:45, 13 February 2025

Location

Date: February 14, 2025

Time: 9 am EST

Room: L102 (CEBAF center)


Experiments: E12-12-002 and E12-12-002A


Charge [1]


Committee members: Stepan Stepanyan (chair), Sergey Boyarinov (DAQ/Trigger), Patrizia Rossi, Ed Folts, Neville Malabre-O'Sullivan

ERR Agenda

8:45-9:00: Executive session

9:00-9:45: Status of the ECAL commissioning (25+20) A. Somov (addressing charges 1, 2, 3, 5, and 6)

9:45-10:15: Status of the FCAL part (15+15) M. Albrecht (addressing charges 1, 3, and 6)

10:15-10:30 Coffee break

10:30-11:00: Engineering design of the detector frame and cooling system (15+15) T. Whitlatch (addressing charge 2)

11:00-11:30: "Integration of the ECAL into the GlueX framework (15+15) A. Somov (addressing charge 4)

11:30-12:00: Shower reconstruction and FCAL2 detector calibration (15+15) S. Taylor (addressing charge 5)

12:00-12:30 (tentative) : Executive session

12:30: (tentative) Closeout

Documentation

  • JLab-PTW-3811 Maintenance of the GlueX trigger system [2][3]
  • JLab-PTW-5236 Maintenance of the Hall D ECAL [4][5]
  • JLab-PTW-6092 Maintenance of the FCAL2 lead glass part [6][7]

Supplementary Material