Difference between revisions of "FCAL2 Readiness Review"

From GlueXWiki
Jump to: navigation, search
(Documentation)
(ERR Agenda)
Line 25: Line 25:
 
8:45-9:00: Executive session
 
8:45-9:00: Executive session
  
9:00-9:45: "Status of the ECAL commissioning" (25+20) A. Somov  (addressing charges 1, 2, 3, 5, and 6)
+
9:00-9:45: [https://halldweb.jlab.org/detectors/fcal2/fcal2_review/ecal_err.pptx  Status of the ECAL commissioning] (25+20) A. Somov  (addressing charges 1, 2, 3, 5, and 6)  
  
 
9:45-10:15: "Status of the FCAL part"  (15+15) M. Albrecht (addressing charges 1, 3, and 6)
 
9:45-10:15: "Status of the FCAL part"  (15+15) M. Albrecht (addressing charges 1, 3, and 6)

Revision as of 13:24, 10 February 2025

Location

Date: February 14, 2025

Time: 9 am EST

Room: L102 (CEBAF center)


Experiments: E12-12-002 and E12-12-002A


Charge [1]


Committee members: Stepan Stepanyan (chair), Sergey Boyarinov (DAQ/Trigger), Patrizia Rossi, Ed Folts, Neville Malabre-O'Sullivan

ERR Agenda

8:45-9:00: Executive session

9:00-9:45: Status of the ECAL commissioning (25+20) A. Somov (addressing charges 1, 2, 3, 5, and 6)

9:45-10:15: "Status of the FCAL part" (15+15) M. Albrecht (addressing charges 1, 3, and 6)

10:15-10:30 Coffee break

10:30-11:00: "Engineering design of the detector frame and cooling system" (15+15) T. Whitlatch (addressing charge 2)

11:00-11:30: "Integration of the ECAL into the GlueX framework" (15+15) A. Somov (addressing charge 4)

11:30-12:00: "Shower reconstruction and FCAL2 detector calibration" (15+15) S. Taylor (addressing charge 5)

12:00-12:30 (tentative) : Executive session

12:30: (tentative) Closeout

Documentation

  • JLab-PTW-5236 Maintenance of the GlueX trigger system [2][3]
  • JLab-PTW-5236 Maintenance of the Hall D ECAL [4][5]

Supplementary Material