Difference between revisions of "JEF meeting, December 20, 2024"
From GlueXWiki
(→Agenda) |
(→Minutes) |
||
(15 intermediate revisions by 2 users not shown) | |||
Line 30: | Line 30: | ||
* [https://halldweb.jlab.org/detectors/fcal2/installation/safety_docs/safety.jpg Safety briefings] - Vlad, Sasha | * [https://halldweb.jlab.org/detectors/fcal2/installation/safety_docs/safety.jpg Safety briefings] - Vlad, Sasha | ||
* [https://halldweb.jlab.org/wiki/index.php/FCAL_Installation Detector installation page] | * [https://halldweb.jlab.org/wiki/index.php/FCAL_Installation Detector installation page] | ||
− | * Commissioning north part of the ECAL (instrumented with 2 temporary HV distribution boards) [https://logbooks.jlab.org/entry/4319280][https://logbooks.jlab.org/entry/4319672][https://logbooks.jlab.org/entry/4320378][https://logbooks.jlab.org/entry/4320977] | + | * Commissioning north part of the ECAL (instrumented with 2 temporary HV distribution boards) [https://logbooks.jlab.org/entry/4319280][https://logbooks.jlab.org/entry/4319672][https://logbooks.jlab.org/entry/4320378][https://logbooks.jlab.org/entry/4320977][https://logbooks.jlab.org/entry/4323853] |
* Commissioning of the south bottom region [https://logbooks.jlab.org/entry/4323021] | * Commissioning of the south bottom region [https://logbooks.jlab.org/entry/4323021] | ||
* Commissioning of the south top region [https://logbooks.jlab.org/entry/4323644] | * Commissioning of the south top region [https://logbooks.jlab.org/entry/4323644] | ||
+ | * Commissioning of the top north region [https://logbooks.jlab.org/entry/4324241] | ||
+ | * Commissioning of the bottom north region [https://logbooks.jlab.org/entry/4323852] | ||
+ | * All HV distribution boards installed, set HV on the whole detector [https://logbooks.jlab.org/entry/4324595] | ||
* Fix LV issues (north top region) [https://logbooks.jlab.org/entry/4323643] | * Fix LV issues (north top region) [https://logbooks.jlab.org/entry/4323643] | ||
* First cosmic event in the ECAL [https://logbooks.jlab.org/entry/4320980] | * First cosmic event in the ECAL [https://logbooks.jlab.org/entry/4320980] | ||
− | * Temperature scan in the ECAL divider region [https://logbooks.jlab.org/entry/4320981][https://logbooks.jlab.org/entry/4321406][https://logbooks.jlab.org/entry/4321241][https://logbooks.jlab.org/ | + | * Temperature scan in the ECAL divider region [https://logbooks.jlab.org/entry/4320981][https://logbooks.jlab.org/entry/4321406][https://logbooks.jlab.org/entry/4321241][https://logbooks.jlab.org/entr /4321188][https://logbooks.jlab.org/entry/4324242?destination=node/1397299] |
:: Meeting with Tim, additional fans will be installed | :: Meeting with Tim, additional fans will be installed | ||
* Repairing a few ECAL LMS optical fibers [https://logbooks.jlab.org/entry/4320978][https://logbooks.jlab.org/entry/4321408] | * Repairing a few ECAL LMS optical fibers [https://logbooks.jlab.org/entry/4320978][https://logbooks.jlab.org/entry/4321408] | ||
Line 54: | Line 57: | ||
''' [https://halldweb.jlab.org/wiki/index.php/ECAL_Commissioning ECAL commissioning]''' -- Sasha, All | ''' [https://halldweb.jlab.org/wiki/index.php/ECAL_Commissioning ECAL commissioning]''' -- Sasha, All | ||
− | '''Laveen update'''[[https://halldweb.jlab.org/DocDB/ | + | '''Laveen update'''[[https://halldweb.jlab.org/DocDB/0067/006708/001/Status_Update_18Dec.pdf]] |
'''Calibrations''' | '''Calibrations''' | ||
Line 61: | Line 64: | ||
:: -[https://halldweb.jlab.org/detectors/fcal2/installation/meetings/12_06_2024 Adjusting HVs] | :: -[https://halldweb.jlab.org/detectors/fcal2/installation/meetings/12_06_2024 Adjusting HVs] | ||
'''Analysis/Simulation''' | '''Analysis/Simulation''' | ||
+ | |||
+ | =Minutes= | ||
+ | Attendees: Bill, Phil, Igal, Liping, Sasha, Vlad, Zhikun, Jane, Olga, Laveen, Jane, Zisis | ||
+ | |||
+ | * HV Distribution Boards: | ||
+ | ** installed 2 HV distribution boards on the north side | ||
+ | ** cables arranged and connected; issues resolved (by Sammy): | ||
+ | *** two connectors with broken lock clips | ||
+ | *** two connectors with small holes | ||
+ | *** multi-pin connectors being pressed by long screws | ||
+ | *** one faulty HV channel on the bottom north PCB—reconnected to a spare channel | ||
+ | * Detector power-up and testing using the LMS: | ||
+ | ** entire detector powered up | ||
+ | ** fixed minor issues, such as loose PMT socket connections | ||
+ | ** confirmed all ECAL channels are operational | ||
+ | ** need to restore HV cable mapping in CSS after final board installation | ||
+ | * Temperature sensors | ||
+ | ** two sensors on the top corners of the detector are operational (critical temperature region) | ||
+ | ** some issues with two other sensors, one positioned around the beam pipe, the other one on the bottom north corner (need to uninstall and fix) | ||
+ | ** two sensors will be included into the HV interlock (consider to include the fan into the interlock as well) | ||
+ | ** will be ready to collect cosmic ray data after that | ||
+ | * Chris is finalizing the LMS light source design (to be ordered by end of 2024) | ||
+ | * Bobby 3D printed parts for reference PMTs | ||
+ | * ECAL calibration discussions to begin in the next JEF meeting. |
Latest revision as of 16:58, 3 January 2025
Connection =
Meeting time and location:
- 9:30 am EST (JLab time) remote only
- Connection information
Agenda
Preparation of parts for ECAL -- Sasha
- -Four boxes for HV distribution boards have arrived to the lab. PCBs with HV connectors were installed on 2 distribution boards [1][2]
- -Updated design of the LMS light source with 25 LEDS. PCB layout under preparation, expect to order the new PCB during next week.
- -Four temperature sensors (RTD) arrived to the lab. They will be installed in the ECAL divider region during next week.
- -Two additional fans for cooling the ECAL dividers arrived. Will be installed today.
-Installation of the FCAL2 detector & integration to GlueX -- Sasha, All
- Implementing ECAL into the GlueX DAQ [3]
- - rocecal3 crate was fixed [4] (initial DAQ implementation [5])
- - implementing flash ADC scalers [6][7]
- - translation table for the ECAL (finalize/check translation DB, generate xml file, import to the CCDB) - done [8]
- - implementing and verifying ECAL LMS trigger [9]
- - implementing and verifying the ECAL physics trigger. First event reconstructed using the GlueX software [10]
- - Start implementing VTP trigger modules. Requires modification of firmware. The trigger crates may be unavailable for 1 - 1.5 months.
- - The VTP was installed in the D2-1-TOP crate, IP address assigned, and can be booted now
- - New version of DAQ, VTP included as a DAQ component [11]
- Installation of scintillating paddles for cosmic tests [12] [13][14]
- ECAL HV interlock check [15]
- Cable map of the ECAL LG modules after installing ECAL [16]
- Reinstalling cables on the ECAL LV distribution board [17]
- Safety briefings - Vlad, Sasha
- Detector installation page
- Commissioning north part of the ECAL (instrumented with 2 temporary HV distribution boards) [18][19][20][21][22]
- Commissioning of the south bottom region [23]
- Commissioning of the south top region [24]
- Commissioning of the top north region [25]
- Commissioning of the bottom north region [26]
- All HV distribution boards installed, set HV on the whole detector [27]
- Fix LV issues (north top region) [28]
- First cosmic event in the ECAL [29]
- Temperature scan in the ECAL divider region [30][31][32]/4321188[33]
- Meeting with Tim, additional fans will be installed
- Repairing a few ECAL LMS optical fibers [34][35]
- Preparing for the installation of the insulation on the detector face
- Preparing for the run -- Sasha
- Page for shift Takers
- ECAL in the Experimental Safety Assessment Document (ESAD)
- EPAS for Maintenance of the Hall D ECAL (Jlab-PTW-5236)
- FCAL2 Engineering Meetings
- Remaining installation tasks
- - Installing additional fans (will be installed today)
- - Installing insulation on the detector's face (done)
Restoring PS test setup [38]
ECAL commissioning -- Sasha, All
Laveen update[[39]]
Calibrations
Analysis/Simulation
Minutes
Attendees: Bill, Phil, Igal, Liping, Sasha, Vlad, Zhikun, Jane, Olga, Laveen, Jane, Zisis
- HV Distribution Boards:
- installed 2 HV distribution boards on the north side
- cables arranged and connected; issues resolved (by Sammy):
- two connectors with broken lock clips
- two connectors with small holes
- multi-pin connectors being pressed by long screws
- one faulty HV channel on the bottom north PCB—reconnected to a spare channel
- Detector power-up and testing using the LMS:
- entire detector powered up
- fixed minor issues, such as loose PMT socket connections
- confirmed all ECAL channels are operational
- need to restore HV cable mapping in CSS after final board installation
- Temperature sensors
- two sensors on the top corners of the detector are operational (critical temperature region)
- some issues with two other sensors, one positioned around the beam pipe, the other one on the bottom north corner (need to uninstall and fix)
- two sensors will be included into the HV interlock (consider to include the fan into the interlock as well)
- will be ready to collect cosmic ray data after that
- Chris is finalizing the LMS light source design (to be ordered by end of 2024)
- Bobby 3D printed parts for reference PMTs
- ECAL calibration discussions to begin in the next JEF meeting.