Difference between revisions of "JEF meeting, November 1, 2024"
From GlueXWiki
(Created page with "= Connection = Meeting time and location: *9:30 am EST (JLab time) remote only * [https://halldweb.jlab.org/wiki-private/index.php/JEF_Weekly_Meeting#Connection_information C...") |
(→Agenda) |
||
Line 7: | Line 7: | ||
= Agenda = | = Agenda = | ||
'''Preparation of parts for ECAL''' -- Sasha | '''Preparation of parts for ECAL''' -- Sasha | ||
− | + | * - HV distribution boards [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/08_09_2024/hv_board1.jpg][https://halldweb.jlab.org/detectors/fcal2/installation/meetings/08_09_2024/hv_board2.jpg] | |
+ | :: - Connectors and cables were installed on the PCBs of 2 HV distribution boards. Sammy and Chris are working on the third board, it will likely be ready during next week (Sammy also works on GEM/TRD) | ||
+ | :: - Boxes for HV boards have been just been ordered. Expected delivery date 11/15/2024. | ||
+ | :: - Vince P. has machined parts for two temporary distribution boards. Two temporary HV distribution boards were assembled. The holes for connectors were too narrow, the tech group fixed it. | ||
+ | :: - Have received all parts for the new version of the LMS light source | ||
'''Installation of the FCAL2 detector & integration to GlueX''' -- Sasha, All | '''Installation of the FCAL2 detector & integration to GlueX''' -- Sasha, All | ||
+ | * Installation of the light distribution board of the ECAL LMS [https://logbooks.jlab.org/entry/4317207] | ||
+ | :: - Vlad P. has slightly modified the design of the LMS light source in order to increase the amount of light. Chris S. is working on a new board with 9 LEDs. | ||
+ | * Implementing ECAL into the GlueX DAQ [https://logbooks.jlab.org/entry/4316928] | ||
+ | :: - rocecal3 crate was fixed [https://logbooks.jlab.org/entry/4317415] (initial DAQ implementation [https://logbooks.jlab.org/entry/4316928]) | ||
+ | :: - implementing flash ADC scalers [https://logbooks.jlab.org/entry/4319280][https://logbooks.jlab.org/entry/4319672] | ||
+ | :: - translation table for the ECAL (finalize/check translation DB, generate xml file, import to the CCDB) - done [https://logbooks.jlab.org/entry/4317904] | ||
+ | :: - implementing and verifying ECAL LMS trigger [https://logbooks.jlab.org/entry/4317903] | ||
+ | :: - implementing and verifying the ECAL physics trigger. First event reconstructed using the GlueX software [https://logbooks.jlab.org/entry/4317905] | ||
+ | :: - Start implementing VTP trigger modules. Requires modification of firmware. <span style="color:red"> The trigger crates may be unavailable for 1 - 1.5 months.</span> | ||
+ | ::: - The VTP was installed in the D2-1-TOP crate, IP address assigned, and can be booted now | ||
+ | * Installation of scintillating paddles for cosmic tests [https://logbooks.jlab.org/entry/4317905] [https://logbooks.jlab.org/entry/4318834][https://logbooks.jlab.org/entry/4319535] | ||
+ | * ECAL HV interlock check [https://logbooks.jlab.org/entry/4318704] | ||
+ | * Cable map of the ECAL LG modules after installing ECAL [https://logbooks.jlab.org/entry/4318588] | ||
+ | * Reinstalling cables on the ECAL LV distribution board [https://logbooks.jlab.org/entry/4318905] | ||
+ | * [https://halldweb.jlab.org/detectors/fcal2/installation/safety_docs/safety.jpg Safety briefings] - Vlad, Sasha | ||
+ | * [https://halldweb.jlab.org/wiki/index.php/FCAL_Installation Detector installation page] | ||
+ | * Installation of temporary HV distribution boards and testing flash ADC scalers [https://logbooks.jlab.org/entry/4319280][https://logbooks.jlab.org/entry/4319672] | ||
+ | * [https://halldweb.jlab.org/wiki/index.php/FCAL2_Meetings FCAL2 Engineering Meetings] | ||
+ | * Remaining installation tasks | ||
+ | :: - Connecting cooling pipes to the ECAL fan (done by tech group) | ||
+ | :: - Installing dark room ceiling and insulation inside the room, required for cooling test (almost complete) | ||
+ | :: - Test cooling system (in progress, almost complete) | ||
+ | :: - Installing HV distribution boards, start switching the detector ON (waiting for HV boxes) | ||
'''Restoring PS test setup''' [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/08_09_2024/ps_setup.jpg] | '''Restoring PS test setup''' [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/08_09_2024/ps_setup.jpg] | ||
Line 17: | Line 44: | ||
'''Analysis/Simulation''' | '''Analysis/Simulation''' | ||
+ | |||
+ | :: [https://halldweb.jlab.org/DocDB/0066/006667/001/Update-Oct17.pdf Laveen Update] | ||
+ | |||
+ | ''' Presentation at IEEE ''' [https://halldweb.jlab.org/detectors/fcal2/] | ||
+ | :: Conference trip was not supported by Hall D |
Revision as of 09:14, 1 November 2024
Connection
Meeting time and location:
- 9:30 am EST (JLab time) remote only
- Connection information
Agenda
Preparation of parts for ECAL -- Sasha
- - Connectors and cables were installed on the PCBs of 2 HV distribution boards. Sammy and Chris are working on the third board, it will likely be ready during next week (Sammy also works on GEM/TRD)
- - Boxes for HV boards have been just been ordered. Expected delivery date 11/15/2024.
- - Vince P. has machined parts for two temporary distribution boards. Two temporary HV distribution boards were assembled. The holes for connectors were too narrow, the tech group fixed it.
- - Have received all parts for the new version of the LMS light source
Installation of the FCAL2 detector & integration to GlueX -- Sasha, All
- Installation of the light distribution board of the ECAL LMS [3]
- - Vlad P. has slightly modified the design of the LMS light source in order to increase the amount of light. Chris S. is working on a new board with 9 LEDs.
- Implementing ECAL into the GlueX DAQ [4]
- - rocecal3 crate was fixed [5] (initial DAQ implementation [6])
- - implementing flash ADC scalers [7][8]
- - translation table for the ECAL (finalize/check translation DB, generate xml file, import to the CCDB) - done [9]
- - implementing and verifying ECAL LMS trigger [10]
- - implementing and verifying the ECAL physics trigger. First event reconstructed using the GlueX software [11]
- - Start implementing VTP trigger modules. Requires modification of firmware. The trigger crates may be unavailable for 1 - 1.5 months.
- - The VTP was installed in the D2-1-TOP crate, IP address assigned, and can be booted now
- Installation of scintillating paddles for cosmic tests [12] [13][14]
- ECAL HV interlock check [15]
- Cable map of the ECAL LG modules after installing ECAL [16]
- Reinstalling cables on the ECAL LV distribution board [17]
- Safety briefings - Vlad, Sasha
- Detector installation page
- Installation of temporary HV distribution boards and testing flash ADC scalers [18][19]
- FCAL2 Engineering Meetings
- Remaining installation tasks
- - Connecting cooling pipes to the ECAL fan (done by tech group)
- - Installing dark room ceiling and insulation inside the room, required for cooling test (almost complete)
- - Test cooling system (in progress, almost complete)
- - Installing HV distribution boards, start switching the detector ON (waiting for HV boxes)
Restoring PS test setup [20]
ECAL commissioning -- Sasha, All
Calibrations
Analysis/Simulation
Presentation at IEEE [21]
- Conference trip was not supported by Hall D