'''Students''' -- Sasha
 
'''Students''' -- Sasha
 
* - Expect one student from Wuhan, waiting for the US visa
 
* - Expect one student from Wuhan, waiting for the US visa
* Restoring PS test setup
+
* [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/08_09_2024/lv_board1.jpg Restoring PS test setup]  
::  - [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/08_09_2024/lv_board1.jpg]
+
 
''' [https://halldweb.jlab.org/wiki/index.php/ECAL_Commissioning ECAL commissioning]''' -- Sasha, All
 
''' [https://halldweb.jlab.org/wiki/index.php/ECAL_Commissioning ECAL commissioning]''' -- Sasha, All
 +
 +
=Minutes=
 +
Attendees: Igal, Laveen, Phil, Liping, Vlad, Sasha, Zisis, Stjepan, Ilya, S.T.
 +
* Waiting for cover panels for two LV boards
 +
* No progress in HV distribution board design
 +
* Cables organized on chains and in cable trays
 +
* Installed final version of light distribution board for LMS on integrating sphere
 +
** Looked at signals on some PMTS, pulses look good, but amplitudes somewhat small
 +
** Need to increase light 10x
 +
* Sasha implemented DAQ configuration for ECAL crates
 +
** Optical links work, need to integrate LMS trigger
 +
** Found faulty controller for ROCECAL3
 +
* Dark room installation needs to be completed
 +
* Checking of cooling system still needs to be completed before we can turn on the whole detector
 +
* PS setup in the hall in the process of being restored (we can use this to study some small-scale prototypes)
 +
* Started commissioning run plan

Latest revision as of 10:21, 23 September 2024

Meeting time and location:


Agenda

Preparation of parts for ECAL -- Sasha

  • - HV long cable: Sammy and Mindy are finishing up with assembling cables, 2 cables are left
  • - HV distribution boards [1][2]
- 5 (12 x 4) and 5 (6 x 8) boards have been received. Chris checked connections. All remaining PCB boards are expected to be in the lab on Sep 12.
- Chris is finalizing design of the distribution boxes (each box will comprise 9 PCBs). He expects to submit PR during next week.
  • - Fix front panel of two LV distribution boards [3]
- new plates for the LV distribution boards should arrive today. Need to re-install 2 distribution boards and connect cables

Installation of the FCAL2 detector & integration to GlueX -- Sasha / Vlad / Hakob / Laveen

  • Installation and testing dividers has been completed [4]
- need to arrange cables on chains
- need to arrange cables on cable trays - done [5]
- preparing spare cables (7 short HV, 8 signal and LV)
- Installing HV distribution boards (start switching the detector ON)
- Installing dark room ceiling and insulation inside the room
- Checking cooling system

Students -- Sasha

ECAL commissioning -- Sasha, All

Minutes

Attendees: Igal, Laveen, Phil, Liping, Vlad, Sasha, Zisis, Stjepan, Ilya, S.T.

  • Waiting for cover panels for two LV boards
  • No progress in HV distribution board design
  • Cables organized on chains and in cable trays
  • Installed final version of light distribution board for LMS on integrating sphere
    • Looked at signals on some PMTS, pulses look good, but amplitudes somewhat small
    • Need to increase light 10x
  • Sasha implemented DAQ configuration for ECAL crates
    • Optical links work, need to integrate LMS trigger
    • Found faulty controller for ROCECAL3
  • Dark room installation needs to be completed
  • Checking of cooling system still needs to be completed before we can turn on the whole detector
  • PS setup in the hall in the process of being restored (we can use this to study some small-scale prototypes)
  • Started commissioning run plan