'''Preparation of parts for ECAL''' -- Sasha | '''Preparation of parts for ECAL''' -- Sasha | ||
− | + | * - HV long cable: Sammy and Mindy are finishing up with assembling cables, 2 cables are left | |
− | '''Installation of the FCAL2 detector & integration to GlueX''' -- Sasha / Vlad / Laveen | + | * - HV distribution boards [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/08_09_2024/hv_board1.jpg][https://halldweb.jlab.org/detectors/fcal2/installation/meetings/08_09_2024/hv_board2.jpg] |
− | + | :: - 5 (12 x 4) and 5 (6 x 8) boards have been received. Chris checked connections. All remaining PCB boards are expected to be in the lab on Sep 12. | |
+ | :: - Chris is finalizing design of the distribution boxes (each box will comprise 9 PCBs). He expects to submit PR during next week. | ||
+ | * - Fix front panel of two LV distribution boards [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/08_09_2024/lv_board1.jpg] | ||
+ | ::: - new plates for the LV distribution boards should arrive to JLab during next week. Need to re-install 2 distribution boards and connect cables | ||
+ | * - LED: Started testing the prototype of the LMS (need to make the detector room light tight) | ||
+ | '''Installation of the FCAL2 detector & integration to GlueX''' -- Sasha / Vlad / Hakob / Laveen | ||
+ | * Installation and testing dividers has been completed [https://logbooks.jlab.org/entry/4316213] | ||
+ | :: - need to arrange cables on chains | ||
+ | :: - need to arrange cables on cable trays | ||
+ | * [https://halldweb.jlab.org/wiki/index.php/FCAL_Installation Detector installation page] | ||
+ | * [https://halldweb.jlab.org/detectors/fcal2/installation/safety_docs/Document_240716_195013-1.pdf Safety briefings] | ||
'''Students''' -- Sasha | '''Students''' -- Sasha | ||
− | + | * - Expect one student from Wuhan, waiting for the US visa | |
''' [https://halldweb.jlab.org/wiki/index.php/ECAL_Commissioning ECAL commissioning]''' -- Sasha, All | ''' [https://halldweb.jlab.org/wiki/index.php/ECAL_Commissioning ECAL commissioning]''' -- Sasha, All | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− |
Revision as of 09:02, 20 September 2024
Meeting time and location:
- 9:30 am EST (JLab time) remote only
- Connection information
Agenda
Preparation of parts for ECAL -- Sasha
- - HV long cable: Sammy and Mindy are finishing up with assembling cables, 2 cables are left
- - HV distribution boards [1][2]
- - 5 (12 x 4) and 5 (6 x 8) boards have been received. Chris checked connections. All remaining PCB boards are expected to be in the lab on Sep 12.
- - Chris is finalizing design of the distribution boxes (each box will comprise 9 PCBs). He expects to submit PR during next week.
- - Fix front panel of two LV distribution boards [3]
- - new plates for the LV distribution boards should arrive to JLab during next week. Need to re-install 2 distribution boards and connect cables
- - LED: Started testing the prototype of the LMS (need to make the detector room light tight)
Installation of the FCAL2 detector & integration to GlueX -- Sasha / Vlad / Hakob / Laveen
- Installation and testing dividers has been completed [4]
- - need to arrange cables on chains
- - need to arrange cables on cable trays
Students -- Sasha
- - Expect one student from Wuhan, waiting for the US visa
ECAL commissioning -- Sasha, All