Difference between revisions of "ECAL Commissioning"

From GlueXWiki
Jump to: navigation, search
 
(2 intermediate revisions by the same user not shown)
Line 1: Line 1:
* DAQ configuration
+
* [[Commissioning run plan]]
 +
 
 +
 
 +
* DAQ configuration [https://logbooks.jlab.org/entry/4316928]
  
 
* Tests with the LMS
 
* Tests with the LMS
Line 7: Line 10:
  
 
* HV settings
 
* HV settings
 
[[Commissioning run plan]]
 

Latest revision as of 15:05, 16 September 2024


  • DAQ configuration [1]
  • Tests with the LMS
  • Cosmic tests
initial gain calibration
  • HV settings