Difference between revisions of "ECAL Commissioning"
From GlueXWiki
(2 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
− | * DAQ configuration | + | * [[Commissioning run plan]] |
+ | |||
+ | |||
+ | * DAQ configuration [https://logbooks.jlab.org/entry/4316928] | ||
* Tests with the LMS | * Tests with the LMS | ||
Line 7: | Line 10: | ||
* HV settings | * HV settings | ||
− | |||
− |
Latest revision as of 15:05, 16 September 2024
- DAQ configuration [1]
- Tests with the LMS
- Cosmic tests
- initial gain calibration
- HV settings