Difference between revisions of "Commissioning run plan"

From GlueXWiki
Jump to: navigation, search
(Created page with "# Initial ECAL gain calibration using Compton scattering events * run at small small photon flux; use low-energy TAGH counters to constrain the total energy * Run conditions...")
 
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
# Initial ECAL gain calibration using Compton scattering events
+
'''Initial ECAL gain calibration using Compton scattering events'''
  
 
* run at small small photon flux; use low-energy TAGH counters to constrain the total energy
 
* run at small small photon flux; use low-energy TAGH counters to constrain the total energy
Line 7: Line 7:
 
:: - ECAL & FCAL ( & BCAL trigger), small energy threshold on the total energy (TBD)
 
:: - ECAL & FCAL ( & BCAL trigger), small energy threshold on the total energy (TBD)
 
:: - run duration (TBD)
 
:: - run duration (TBD)
 +
'''Initial ECAL gain calibration using Compton scattering events'''
 +
 +
'''Adjust HV, take more Compton scattering data'''
 +
:: - several data sets will be needed to properly adjust HVs

Latest revision as of 09:23, 6 September 2024

Initial ECAL gain calibration using Compton scattering events

  • run at small small photon flux; use low-energy TAGH counters to constrain the total energy
  • Run conditions:
- amorphous radiator 10-4 R.L., 100 nA beam current
- ECAL & FCAL ( & BCAL trigger), small energy threshold on the total energy (TBD)
- run duration (TBD)

Initial ECAL gain calibration using Compton scattering events

Adjust HV, take more Compton scattering data

- several data sets will be needed to properly adjust HVs