Difference between revisions of "JEF meeting, August 9, 2024"
From GlueXWiki
(Created page with "Meeting time and location: *9:30 am EST (JLab time) remote only * [https://halldweb.jlab.org/wiki-private/index.php/JEF_Weekly_Meeting#Connection_information Connection inform...") |
(→Minutes) |
||
(5 intermediate revisions by 3 users not shown) | |||
Line 5: | Line 5: | ||
=Agenda= | =Agenda= | ||
*'''Preparation of parts for ECAL''' -- Sasha | *'''Preparation of parts for ECAL''' -- Sasha | ||
+ | ** - HV long cable: Sammy and Mindy have to assemble 10 cables | ||
+ | ** - HV distribution boards [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/08_09_2024/hv_board1.jpg][https://halldweb.jlab.org/detectors/fcal2/installation/meetings/08_09_2024/hv_board2.jpg] | ||
+ | ** - Fix front panel of two LV distribution boards, re-install the boards on the detector frame [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/08_09_2024/lv_board1.jpg] | ||
+ | ** - LED: Started testing the prototype of the LMS (need to make the detector room light tight) | ||
+ | <!-- ** - [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/05_10_2024/May-10-2024-L.pdf Update from Laveen] --> | ||
* '''Installation of the FCAL2 detector & integration to GlueX''' -- Sasha / Vlad / Hakob / Laveen | * '''Installation of the FCAL2 detector & integration to GlueX''' -- Sasha / Vlad / Hakob / Laveen | ||
+ | ** Report from students [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/06_28_2024/student_report_06_28_2024.pptx] | ||
+ | ** Installation of HV cables [https://logbooks.jlab.org/entry/4313492][https://halldweb.jlab.org/detectors/fcal2/installation/meetings/08_02_2024] | ||
+ | ::: - two remaining bundle of cables will be ready in about a week | ||
+ | ** Installation and testing cables and dividers [https://logbooks.jlab.org/entry/4314504][https://logbooks.jlab.org/entry/4314582] | ||
+ | ** Installation of long signal cables [https://logbooks.jlab.org/entry/4312667] | ||
+ | ** Installation LV patch panels and cables [https://logbooks.jlab.org/entry/4312759] | ||
+ | ** Installation of optical fibers [https://logbooks.jlab.org/entry/4311499] | ||
+ | ** [https://halldweb.jlab.org/wiki/index.php/FCAL_Installation Detector installation page] | ||
+ | ** [https://halldweb.jlab.org/detectors/fcal2/installation/safety_docs/Document_240716_195013-1.pdf Safety briefings] | ||
* '''Students''' -- Sasha | * '''Students''' -- Sasha | ||
+ | ** - Expect one student from Wuhan, paperwork is in process. | ||
* '''Beam tests with the PS''' | * '''Beam tests with the PS''' | ||
+ | *** measure shower beam profile and reconstruction in the crystal/LG transition region | ||
+ | *** (install prototype with 5x5 PbWO4 modules + ? LG) | ||
* '''Other hardware projects''' | * '''Other hardware projects''' | ||
+ | ** prototype of the ECAL veto counter (?) | ||
*'''Analysis/Simulation''' | *'''Analysis/Simulation''' | ||
+ | ** [https://halldweb.jlab.org/DocDB/0065/006576/001/glue-jefxd-igal-jaegle-09082024.pdf \eta \to \gamma\gamma\pi^0 selection criteria] -- ig | ||
+ | |||
+ | =Minutes= | ||
+ | Attendees: Igal, Laveen, Sasha, Hakob, Stjepan, Phil, Olga, Susan, Jane, S.T. | ||
+ | * Still missing 6 HV cables | ||
+ | * Have 2 HV distribution boards, one with 6x8 and one with 12x4 configuration | ||
+ | * PMT divider installation continues, now finished top 10 layers | ||
+ | ** Check signals with LMS: found a few problems with solder joints, small amplitudes, bad lemo connectors, ... | ||
+ | * Have prototype (final?) design for LMS driver board to be installed on integrating sphere | ||
+ | * Igal gave an update on η→π0γγ selection criteria | ||
+ | ** Tested on spring 2017 GlueX data | ||
+ | ** No signal seen | ||
+ | ** Apparent η→3π0 cross section ~2x larger than expected from Jon's studies -- additional background? | ||
+ | ** Machine learning suppresses 3π0 background |
Latest revision as of 13:11, 12 August 2024
Meeting time and location:
- 9:30 am EST (JLab time) remote only
- Connection information
Agenda
- Preparation of parts for ECAL -- Sasha
- Installation of the FCAL2 detector & integration to GlueX -- Sasha / Vlad / Hakob / Laveen
- - two remaining bundle of cables will be ready in about a week
- Installation and testing cables and dividers [7][8]
- Installation of long signal cables [9]
- Installation LV patch panels and cables [10]
- Installation of optical fibers [11]
- Detector installation page
- Safety briefings
- Students -- Sasha
- - Expect one student from Wuhan, paperwork is in process.
- Beam tests with the PS
- measure shower beam profile and reconstruction in the crystal/LG transition region
- (install prototype with 5x5 PbWO4 modules + ? LG)
- Other hardware projects
- prototype of the ECAL veto counter (?)
- Analysis/Simulation
Minutes
Attendees: Igal, Laveen, Sasha, Hakob, Stjepan, Phil, Olga, Susan, Jane, S.T.
- Still missing 6 HV cables
- Have 2 HV distribution boards, one with 6x8 and one with 12x4 configuration
- PMT divider installation continues, now finished top 10 layers
- Check signals with LMS: found a few problems with solder joints, small amplitudes, bad lemo connectors, ...
- Have prototype (final?) design for LMS driver board to be installed on integrating sphere
- Igal gave an update on η→π0γγ selection criteria
- Tested on spring 2017 GlueX data
- No signal seen
- Apparent η→3π0 cross section ~2x larger than expected from Jon's studies -- additional background?
- Machine learning suppresses 3π0 background