Difference between revisions of "JEF meeting, August 9, 2024"
From GlueXWiki
Line 29: | Line 29: | ||
*'''Analysis/Simulation''' | *'''Analysis/Simulation''' | ||
** [https://halldweb.jlab.org/DocDB/0065/006576/001/glue-jefxd-igal-jaegle-09082024.pdf \eta \to \gamma\gamma\pi^0 selection criteria] -- ig | ** [https://halldweb.jlab.org/DocDB/0065/006576/001/glue-jefxd-igal-jaegle-09082024.pdf \eta \to \gamma\gamma\pi^0 selection criteria] -- ig | ||
+ | |||
+ | =Minutes= | ||
+ | Attendees: Igal, Laveen, Sasha, Hakob, Stjepan, Phil, Olga, Susan, Jane, S.T. | ||
+ | * Still missing 6 HV cables | ||
+ | * Have 2 HV distribution boards, one with 6x8 and one with 12x4 configuration | ||
+ | * PMT divider installation continues, now finished top 10 layers | ||
+ | ** Check signals with LMS: found a few problems with solder joints, small amplitudes, bad lemo connectors, ... | ||
+ | * Have prototype (final?) design for LMS driver board to be installed on integrating sphere | ||
+ | * Igal gave an update on η→&pi0;γγ selection criteria | ||
+ | ** Tested on spring 2017 GlueX data | ||
+ | ** No signal seen | ||
+ | ** Apparent η→3π0 cross section ~2x larger than expected from Jon's studies -- additional background? | ||
+ | ** Machine learning suppresses 3π0 background |
Revision as of 13:10, 12 August 2024
Meeting time and location:
- 9:30 am EST (JLab time) remote only
- Connection information
Agenda
- Preparation of parts for ECAL -- Sasha
- Installation of the FCAL2 detector & integration to GlueX -- Sasha / Vlad / Hakob / Laveen
- - two remaining bundle of cables will be ready in about a week
- Installation and testing cables and dividers [7][8]
- Installation of long signal cables [9]
- Installation LV patch panels and cables [10]
- Installation of optical fibers [11]
- Detector installation page
- Safety briefings
- Students -- Sasha
- - Expect one student from Wuhan, paperwork is in process.
- Beam tests with the PS
- measure shower beam profile and reconstruction in the crystal/LG transition region
- (install prototype with 5x5 PbWO4 modules + ? LG)
- Other hardware projects
- prototype of the ECAL veto counter (?)
- Analysis/Simulation
Minutes
Attendees: Igal, Laveen, Sasha, Hakob, Stjepan, Phil, Olga, Susan, Jane, S.T.
- Still missing 6 HV cables
- Have 2 HV distribution boards, one with 6x8 and one with 12x4 configuration
- PMT divider installation continues, now finished top 10 layers
- Check signals with LMS: found a few problems with solder joints, small amplitudes, bad lemo connectors, ...
- Have prototype (final?) design for LMS driver board to be installed on integrating sphere
- Igal gave an update on η→&pi0;γγ selection criteria
- Tested on spring 2017 GlueX data
- No signal seen
- Apparent η→3π0 cross section ~2x larger than expected from Jon's studies -- additional background?
- Machine learning suppresses 3π0 background