Difference between revisions of "JEF meeting, August 2, 2024"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
 
Line 28: Line 28:
 
** prototype of the ECAL veto counter (?)
 
** prototype of the ECAL veto counter (?)
 
*'''Analysis/Simulation'''
 
*'''Analysis/Simulation'''
** [https://halldweb.jlab.org/wiki/images/9/93/August-2-Status-Update.pdf  Update from Laveen]
 
 
** [https://halldweb.jlab.org/wiki/images/9/93/August-2-Status-Update.pdf  Update from Laveen]
 
** [https://halldweb.jlab.org/wiki/images/9/93/August-2-Status-Update.pdf  Update from Laveen]
  

Latest revision as of 09:18, 9 August 2024

Meeting time and location:

Agenda

Agenda=

  • Preparation of parts for ECAL -- Sasha
    • - HV long cable: Sammy and Mindy have to assemble 10 cables
    • - HV distribution boards. Chris has completed the design of the HV distribution boards. We met with Chris, Tim, and Scot regarding location of the boards on the detector frame
    • - LED: Started testing the prototype of the LMS (need to make the detector room light tight)
  • Installation of the FCAL2 detector & integration to GlueX -- Sasha / Vlad / Hakob / Laveen
  • Students -- Sasha
    • - Expect one student from Wuhan, paperwork is in process.
  • Beam tests with the PS
      • measure shower beam profile and reconstruction in the crystal/LG transition region
      • (install prototype with 5x5 PbWO4 modules + ? LG)
  • Other hardware projects
    • prototype of the ECAL veto counter (?)
  • Analysis/Simulation

Minutes

Attendees: Bill, Igal, Sasha, Laveen, Vlad, Hakob, Ilya, Phil, S.T.

  • Bill will be representing JEF at a workshop in Krakow, Poland in September (19th-20th): [8]. We should provide him slides this month.
  • Installation of PMT dividers in the top half of ECAL continues
    • Looking at signals on oscilloscope
    • Rate 1 layer/day
    • Found some loose connections and loose soldering joints (connnecting PMT sockets to printed circuit boards)
  • Assembly of HV cables continues (now have 30 out of 36)
    • Will have two bundles of 18 connected to HV distribution boards
  • Laveen gave an update on 2-shower separation studies using Island Algorithm for HyCAL geometry
    • Separation efficiency depends on relative energy between 2 showers