Difference between revisions of "JEF meeting, August 2, 2024"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 12: Line 12:
 
** Report from students [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/06_28_2024/student_report_06_28_2024.pptx]
 
** Report from students [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/06_28_2024/student_report_06_28_2024.pptx]
 
** Installation of HV cables [https://logbooks.jlab.org/entry/4313492]
 
** Installation of HV cables [https://logbooks.jlab.org/entry/4313492]
** Installation and testing cables and dividers [https://logbooks.jlab.org/entry/4313507]
+
** Installation and testing cables and dividers [https://logbooks.jlab.org/entry/4313509]
 
** Installation of long signal cables [https://logbooks.jlab.org/entry/4312667]
 
** Installation of long signal cables [https://logbooks.jlab.org/entry/4312667]
 
** Installation LV patch panels and cables [https://logbooks.jlab.org/entry/4312759]
 
** Installation LV patch panels and cables [https://logbooks.jlab.org/entry/4312759]

Revision as of 17:43, 1 August 2024

Meeting time and location:

Agenda

  • Preparation of parts for ECAL -- Sasha
    • - HV long cable: Sammy and Mindy have to assemble 10 cables
    • - HV distribution boards. Chris has completed the design of the HV distribution boards. We met with Chris, Tim, and Scot regarding location of the boards on the detector frame
    • - LED: Started testing the prototype of the LMS (need to make the detector room light tight)
  • Installation of the FCAL2 detector & integration to GlueX -- Sasha / Vlad / Hakob / Laveen
  • Students -- Sasha
    • - Expect one student from Wuhan, paperwork is in process.
  • Beam tests with the PS
      • measure shower beam profile and reconstruction in the crystal/LG transition region
      • (install prototype with 5x5 PbWO4 modules + ? LG)
  • Other hardware projects
    • prototype of the ECAL veto counter (?)
  • Analysis/Simulation