− | = Thursday February 2 =
| |
− | === Past 24 hours ===
| |
− | * Maintenance day, tour of Hall D by EIC review people. Beam is back at midnight.
| |
− | * Harp scans look OK [https://logbooks.jlab.org/entry/4122117]
| |
− | * Production on diamond. ABU= 2.9h for the day.
| |
− |
| |
− | === Shift Reports ===
| |
− | * [https://logbooks.jlab.org/entry/4121686 Day shift summary]
| |
− | * [https://logbooks.jlab.org/entry/4121890 Swing shift summary]
| |
− | * [https://logbooks.jlab.org/entry/4122055 Owl shift summary]
| |
− | * [https://logbooks.jlab.org/entry/4122252 Early Riser shift summary]
| |
− |
| |
− | === Reports ===
| |
− | * [https://logbooks.jlab.org/entry/4121698 HVB current during HV scans] (Naomi).
| |
− | * [https://logbooks.jlab.org/entry/4122018 CDC HVB current vs beam current using this morning's scan] (Naomi).
| |
− | * [https://logbooks.jlab.org/entry/4122025 Current limits and rough estimates of safe HV] (Naomi).
| |
− | * [https://logbooks.jlab.org/entry/4121702 Translation table updated for TAGM] (Justin) .
| |
− | * [https://logbooks.jlab.org/entry/4121789 Swapped HV module for TAGH ch 145 to 168] (Boris).
| |
− | * [https://logbooks.jlab.org/entry/4121989 Attenuation in different materials] (Lubomir).
| |
− | * [https://logbooks.jlab.org/entry/4122324 Transmission has dropped over the night] (Alexandre).
| |
− | * [https://logbooks.jlab.org/entry/4121493 Trigger rates in 2020 and 2023] (Sasha).
| |
− | * [https://logbooks.jlab.org/entry/4122311 High Intensity Foil Absorbers] (Scot).
| |
− | * Remote reset for CAEN chassis (Tim and Bobby).
| |
− |
| |
− |
| |
− | *GlueX Statistics
| |
− | **PARA 0/90: 16%
| |
− | **PERP 0/90: 19%
| |
− | **PARA 45/135: 20%
| |
− | **PERP 45/135: 18%
| |
− | **AMO : 25%
| |
− |
| |
− | === Issues ===
| |
− | * [https://logbooks.jlab.org/entry/4117764 Start Counter (Beni)] We want to confirm that the cables are in the right location.
| |
− | * [https://logbooks.jlab.org/entry/4121311 Reconstructed Photon Beam Energy Spectrum Deep between 10-11 GeV (Churamani)] May be a an issue with timing offset calibrations.
| |
− |
| |
− | Pending:
| |
− | * BCM calibration. Accelerator instrumentation group informed us that last BLA calibration was done in 2021 (beside that done Thursday, 01/19/2023? To be confirmed) and recommend Ops to do one at each start of the run period. PD will keep in contact with us on how to proceed.
| |
− |
| |
− | === Plans ===
| |
− | * Wait for stable beam delivery for 4 halls. No timelime can be given.
| |
− | * CDC & FDC response studies at high luminosities. May not happen today, depends on 1uA beam delivery to Hall D.
| |
− | * Production (300 nA, 2h runs) with cycle:
| |
− | **2 runs para(0/90)
| |
− | **2 runs perp(0/90)
| |
− | **2 runs para(45/135)
| |
− | **2 runs perp(45/135)
| |
− | **1 run amo (use it to rejuvenate amo reference in CBREM GUI)
| |
− |
| |
− |
| |
− |
| |
− |
| |
− |
| |
− |
| |
− | = Thursday February 3 =
| |
− | === Past 24 hours ===
| |
− | * Recovery from maintenance day. PSPEC troubleshooting. Test runs.
| |
− |
| |
− |
| |
− | === Shift Reports ===
| |
− | * [https://logbooks.jlab.org/entry/4122399 Day shift summary]
| |
− | * [https://logbooks.jlab.org/entry/4122719 Swing shift summary]
| |
− | * [https://logbooks.jlab.org/entry/4123024 Owl shift summary]
| |
− | * [https://logbooks.jlab.org/entry/4123280 Early Riser shift summary]
| |
− |
| |
− | === Reports ===
| |
− | * [https://logbooks.jlab.org/entry/4122571 Power supply trip] (Tim, Scot).
| |
− | * [https://logbooks.jlab.org/entry/4122910 PS magnet at 800A] (Eugene).
| |
− | * [https://logbooks.jlab.org/entry/4122780 ALERT to shift leader: two TAGM columns still at operating Vbias] (Richard).
| |
− | * [https://logbooks.jlab.org/entry/4122719 Current scan to 950nA] (Lubomir)
| |
− |
| |
− |
| |
− | *GlueX Statistics
| |
− | **PARA 0/90: 16%
| |
− | **PERP 0/90: 19%
| |
− | **PARA 45/135: 20%
| |
− | **PERP 45/135: 18%
| |
− | **AMO : 25%
| |
− |
| |
− | === Issues ===
| |
− | * [https://logbooks.jlab.org/entry/4122848 Pair Spec Magnet Power Supply Flush in morning (Tim)] We need to get PSPEC working at 1200Amps.
| |
− | * [https://logbooks.jlab.org/entry/4117764 Start Counter (Beni)] We want to confirm that the cables are in the right location.
| |
− | * [https://logbooks.jlab.org/entry/4121311 Reconstructed Photon Beam Energy Spectrum Deep between 10-11 GeV (Churamani)] May be a an issue with timing offset calibrations.
| |
− |
| |
− | Pending:
| |
− | * BCM calibration. Accelerator instrumentation group informed us that last BLA calibration was done in 2021 (beside that done Thursday, 01/19/2023? To be confirmed) and recommend Ops to do one at each start of the run period. PD will keep in contact with us on how to proceed.
| |
− |
| |
− | === Plans ===
| |
− | * Citra flush PSPEC power supply.
| |
− | * Production (300 nA, 2h runs) with cycle:
| |
− | **2 runs para(0/90)
| |
− | **2 runs perp(0/90)
| |
− | **2 runs para(45/135)
| |
− | **2 runs perp(45/135)
| |
− | **1 run amo (use it to rejuvenate amo reference in CBREM GUI)
| |