|
|
(58 intermediate revisions by 2 users not shown) |
Line 1: |
Line 1: |
− | [https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard]
| |
| | | |
− | [https://halldweb.jlab.org/online/whiteboard/ Hall D counting room white board]
| |
− |
| |
− | [https://docs.google.com/spreadsheets/d/1NffTc4-S5PbTMSuH_pp7ZYsGRH4JC_WSVo770_iJYt0/edit#gid=60671503 Spreadsheet with list of runs]
| |
− |
| |
− | [https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2023-01/index.html Integrated Trigger Count]
| |
− |
| |
− | = Thursday February 2 =
| |
− | === Past 24 hours ===
| |
− | * Maintenance day, tour of Hall D by EIC review people.
| |
− | * Harp scans []
| |
− | * Production on diamond. ABU= ?? h for the day.
| |
− |
| |
− | === Shift Reports ===
| |
− | * [ https://logbooks.jlab.org/entry/4121686 Day shift summary]
| |
− | * [ https://logbooks.jlab.org/entry/4121890 Swing shift summary]
| |
− | * [ Owl shift summary]
| |
− | * [ Early Riser shift summary]
| |
− |
| |
− | === Reports ===
| |
− | * [https://logbooks.jlab.org/entry/4121698 HVB current during HV scans ] (Naomi).
| |
− | * [https://logbooks.jlab.org/entry/4121702 Translation table updated for TAGM] (Justin)
| |
− | * [https://logbooks.jlab.org/entry/4121789 Swapped HV module for TAGH ch 145 to 168] (Boris)
| |
− | * [https://logbooks.jlab.org/entry/4121989 Attenuation in different materials] (Lubomir)
| |
− | * [https://logbooks.jlab.org/entry/4121493 Trigger rates in 2020 and 2023] (Sasha)
| |
− | * Remote reset for CAEN chassis (Tim and Bobby)
| |
− |
| |
− |
| |
− | *GlueX Statistics
| |
− | **PARA 0/90: %
| |
− | **PERP 0/90: %
| |
− | **PARA 45/135: %
| |
− | **PERP 45/135: %
| |
− | **AMO : %
| |
− |
| |
− | === Issues ===
| |
− | * [https://logbooks.jlab.org/entry/4117764 Start Counter (Beni)] We want to confirm that the cables are in the right location
| |
− | * [https://logbooks.jlab.org/entry/4121311 Reconstructed Photon Beam Energy Spectrum Deep between 10-11 GeV (Churamani)] May be a an issue with timing offset calibrations.
| |
− |
| |
− | Pending:
| |
− | * BCM calibration. Accelerator instrumentation group informed us that last BLA calibration was done in 2021 (beside that done Thursday, 01/19/2023? To be confirmed) and recommend Ops to do one at each start of the run period. PD will keep in contact with us on how to proceed.
| |
− |
| |
− | === Plans ===
| |
− | * Production (300 nA, 2h runs) with cycle:
| |
− | **2 runs para(0/90)
| |
− | **2 runs perp(0/90)
| |
− | **2 runs para(45/135)
| |
− | **2 runs perp(45/135)
| |
− | **1 run amo (use it to rejuvenate amo reference in CBREM GUI)
| |
− | * Trigger fine tuning Thursday? (A. Somov)
| |