Difference between revisions of "Run Planning Meeting Notes, February 2 - February 9, 2023"
From GlueXWiki
(→Reports) |
(→Plans) |
||
Line 43: | Line 43: | ||
=== Plans === | === Plans === | ||
+ | * CDC & FDC response studies at high luminosities. | ||
* Production (300 nA, 2h runs) with cycle: | * Production (300 nA, 2h runs) with cycle: | ||
**2 runs para(0/90) | **2 runs para(0/90) | ||
Line 49: | Line 50: | ||
**2 runs perp(45/135) | **2 runs perp(45/135) | ||
**1 run amo (use it to rejuvenate amo reference in CBREM GUI) | **1 run amo (use it to rejuvenate amo reference in CBREM GUI) | ||
− |
Revision as of 21:34, 1 February 2023
Hall D counting room white board
Thursday February 2
Past 24 hours
- Maintenance day, tour of Hall D by EIC review people.
- Harp scans []
- Production on diamond. ABU= ?? h for the day.
Shift Reports
- [ https://logbooks.jlab.org/entry/4121686 Day shift summary]
- [ https://logbooks.jlab.org/entry/4121890 Swing shift summary]
- [ Owl shift summary]
- [ Early Riser shift summary]
Reports
- HVB current during HV scans (Naomi).
- Translation table updated for TAGM (Justin)
- Swapped HV module for TAGH ch 145 to 168 (Boris)
- Attenuation in different materials (Lubomir)
- Trigger rates in 2020 and 2023 (Sasha)
- Remote reset for CAEN chassis (Tim and Bobby)
- GlueX Statistics
- PARA 0/90: %
- PERP 0/90: %
- PARA 45/135: %
- PERP 45/135: %
- AMO : %
Issues
- Start Counter (Beni) We want to confirm that the cables are in the right location
- Reconstructed Photon Beam Energy Spectrum Deep between 10-11 GeV (Churamani) May be a an issue with timing offset calibrations.
Pending:
- BCM calibration. Accelerator instrumentation group informed us that last BLA calibration was done in 2021 (beside that done Thursday, 01/19/2023? To be confirmed) and recommend Ops to do one at each start of the run period. PD will keep in contact with us on how to proceed.
Plans
- CDC & FDC response studies at high luminosities.
- Production (300 nA, 2h runs) with cycle:
- 2 runs para(0/90)
- 2 runs perp(0/90)
- 2 runs para(45/135)
- 2 runs perp(45/135)
- 1 run amo (use it to rejuvenate amo reference in CBREM GUI)