Line 41: | Line 41: | ||
** 250 MHz frequency. | ** 250 MHz frequency. | ||
** Range: 1 nA-900 | ** Range: 1 nA-900 | ||
− | ** Chopper slit: <font color="red"> TBD </font> | + | ** Chopper slit: <font color="red"> TBD (assume C, since Hall C will be at 5-pass all the time)</font> |
**Standard current and radiators | **Standard current and radiators | ||
***~350 nA on a 4.1·10<sup>-4</sup> R.L. radiator (50 μm diamond). (RSAD limit 500nA on 58 μm diamond)) <font color="red"> Is this still valid? </font> | ***~350 nA on a 4.1·10<sup>-4</sup> R.L. radiator (50 μm diamond). (RSAD limit 500nA on 58 μm diamond)) <font color="red"> Is this still valid? </font> | ||
Line 70: | Line 70: | ||
**Other? | **Other? | ||
+ | ==General Information== | ||
+ | This document describes the run plan for the Hall D Spring 2023 run. | ||
+ | * Schedule for the run (see [https://www.jlab.org/sites/default/files/user-liaison/files/Scheduing-Memo-20220724.pdf July 2022-March 2024 official schedule]): | ||
+ | # January 5th -12th: Electron beam restoration. | ||
+ | # January 12th - March 20th: 10 weeks for GlueX high luminosity production. | ||
+ | |||
+ | * Accelerator overall plan and priorities: Deliver physics beam to 4 halls | ||
+ | **Hall A, always at 4-pass, is scheduled stop early, on March. 13th. | ||
+ | **Halls B and or C will always be at 5-pass | ||
+ | |||
+ | *Hall D plan <font color="red"> Tentative guess </font> | ||
+ | **Experiment: GlueX-II [https://misportal.jlab.org/mis/physics/experiments/viewProposal.cfm?paperId=834 E12-12-002] | ||
+ | **One (?) TAC run. | ||
+ | **Two (?) empty target runs (One at the start of the run, the other consecutive to TAC run) | ||
+ | ** Straight track run (?) | ||
+ | ***Overall, one night of good data. | ||
+ | **Opportunistic tests? | ||
+ | |||
+ | * Expected Staffing and responsibilities: | ||
**The Run Coordinator oversees the run: | **The Run Coordinator oversees the run: | ||
*** January 12 - 18, 6 days: Joerg Reinhold | *** January 12 - 18, 6 days: Joerg Reinhold |
Revision as of 16:13, 8 December 2022
Spring 2023 Run
Run Statistics Google Spreadsheet.
GlueX experiment (January 12 - March 20 2023)
Connect Information
To connect from the outside by phone please do the following
1.) To join via a Web Browser, go to the page [1] https://bluejeans.com/660743227.
2.) To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 660743227.
3.) To join via phone, use one of the following numbers and the Conference ID: 660743227.
4.) The moderator code is 8394
Dial Either +1 408 740 7256 or +1 888 240 2560 for US or Canada
Specific instructions for connecting from JLab's Hall D conference room:
- Turn polycon on if necessary (do it before turning the computer on)
- With the polycon, place a call at 199.48.152.152
- Press # to enable the polycom keypad, then enter the meeting id: 660743227 and #
- You may have to unmute the microphone: #*4
- Turn the computer on if needed
Beam and Hall configuration
- Beam energy expected:
- 11.55 GeV
- Solenoid:
- 1350A
- CW Beam:
- 250 MHz frequency.
- Range: 1 nA-900
- Chopper slit: TBD (assume C, since Hall C will be at 5-pass all the time)
- Standard current and radiators
- ~350 nA on a 4.1·10-4 R.L. radiator (50 μm diamond). (RSAD limit 500nA on 58 μm diamond)) Is this still valid?
- ~350 nA on a 33.7·10-5 R.L. AL radiator (30 µm Al). (RSAD limit 600nA on 30 µm Al radiator))
- Position Slow Lock on or FFB on (FFB doesn't operate below 50nA).
- Radiators:
- Goniometer radiators:
- Diamond TBD
- Amorphous 40 μm Al radiator (44.9·10-5 R.L.)
- V-wire (for TAC run).
- Amorphous
- 1.64 µm Al (1.86·10-5 R.L., see study)
- 10 µm Al (11.2·10-5 R.L.)
- 30 µm Al (33.7·10-5 R.L.)
- Goniometer radiators:
- Tagger quadrupole on (-4.2 A).
- Collimator hole: Default running: 5.0 mm.
- Targets:
- LH2 target: cryogenic target