Difference between revisions of "Run Planning Meeting Notes, September 1 - September 7, 2022"
From GlueXWiki
Line 15: | Line 15: | ||
* Lengthy beam off period Friday evening due to vacuum pump in the south linac (~1 shift) | * Lengthy beam off period Friday evening due to vacuum pump in the south linac (~1 shift) | ||
* [https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2022-08/index.html Total triggers so far this run] | * [https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2022-08/index.html Total triggers so far this run] | ||
+ | * 100 nA and 50 nA production runs | ||
=== Issues from the weekend === | === Issues from the weekend === | ||
* [https://logbooks.jlab.org/entry/4037283 Return of the ST gap] | * [https://logbooks.jlab.org/entry/4037283 Return of the ST gap] | ||
− | * [https://logbooks.jlab.org/entry/4037306 Out of date list of subsystem experts] | + | ** [https://logbooks.jlab.org/entry/4037699 Hydra needs ST training] |
+ | * [https://logbooks.jlab.org/entry/4037306 Out of date list of subsystem experts, some updates applied in the wiki] | ||
+ | * [https://logbooks.jlab.org/entry/4037666], [https://logbooks.jlab.org/entry/4037662] Overnight FCAL voltage issue | ||
+ | * Remote connection to counting room | ||
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] === | === [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] === | ||
Line 27: | Line 31: | ||
* Trigger studies | * Trigger studies | ||
* Run details from logbook | * Run details from logbook | ||
− | ** [ 0400-1000 04/09] | + | ** [https://logbooks.jlab.org/entry/4037625 0400-1000 04/09] |
− | ** [ 2200-0400 03/09-04/09] | + | ** [https://logbooks.jlab.org/entry/4037568 2200-0400 03/09-04/09] |
− | ** [ 1600-2200 03/09] | + | ** [https://logbooks.jlab.org/entry/4037428 1600-2200 03/09] |
** [https://logbooks.jlab.org/entry/4037367 1000-1600 03/09] | ** [https://logbooks.jlab.org/entry/4037367 1000-1600 03/09] | ||
** [https://logbooks.jlab.org/entry/4037297 0400-1000 03/09] | ** [https://logbooks.jlab.org/entry/4037297 0400-1000 03/09] |
Revision as of 12:05, 4 September 2022
Meetings are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)
Hall D counting room white board
Back to Run Coordination Meetings:Fall2022
Contents
Monday, September 5
Labor Day Holiday Special (9.30am, note one-off different time)
Weekend Run Updates
- Missing RootSpy plots found
- Lengthy beam off period Friday evening due to vacuum pump in the south linac (~1 shift)
- Total triggers so far this run
- 100 nA and 50 nA production runs
Issues from the weekend
- Return of the ST gap
- Out of date list of subsystem experts, some updates applied in the wiki
- [1], [2] Overnight FCAL voltage issue
- Remote connection to counting room
Plan
Sunday, September 4
- No Meeting
- Production Running on Be target at 100 nA
- Trigger studies
- Run details from logbook
Saturday, September 3
- No Meeting
- Production Running on Be target at 200 nA
- Expecting minor updates to FCAL HV
- Switch to 100 nA
- Run details from logbook
Friday, September 2
Past 24 hours
- Total triggers so far this run
- CDC AI is online!
- FCAL HV Scan
- More details can be found here
- Overnight production running at 200 nA
Issues
- Shift crew just reported that Ar and CO2 cylinders are low
- DAQ issues late night
- Hydra very slow updating last night (>10,000 seconds)
Plan
- Intensity scan; 3 shifts each at 50nA and 100 nA, 12 shifts at 200 nA (almost 6 completed)
- Trigger Studies
- Access needed to restore target comms
- Solenoid ramp down Monday, zero field runs Tuesday
- Target change intended for Wednesday
Thursday, September 1
Past 24 hours
- Be target inserted
- 5 FCAL bases replaced (Rebecca)
- Electric work
- AC & SC Electronics (Nick)
- Target alarms temporarily disabled
- [3], [4], [5] Active Collimator studies
- AC calibration, new lock positions
- Production on Be target (Sasha)
- More details can be found here
- Overnight production running at 200 nA
Issues
- FDC and CDC alarms
- 3 channels of start counter lost on Firday around 14:00h during snake scan. Since no monitoring plots were published till run 110449 Monday 22:30 this issue was not immediately seen. This was fixed yesterday during the target change. logbook 403559
- According to the TOF paddle rates the TOF detector as a whole is a little to the right and low on the beam. (higher rates on the vertical paddles_beam_left and higher rates on the horizontal paddles_beam_up). logbook 403559
- Thanks to Thomas HYDRA is now working also.
- RCDB not uptading from around 08.30, possibly related to DAQ issue at start of last run
Plan
- Brief accelerator downtime around 1pm for preventative maintenance on a UPS in the injector
- Trigger study (Sasha)
- Detector checkout (raw mode for ADCs & pi0 for FCAL)
- Intensity scan?
- Physics production
- Take data with B-field (six shifts at 200 nA, then two each at 100 nA and 50 nA)
The hot checkout page
Readiness Check List
- Solenoid (Eugene/Beni)
- Start the run with magnetic field on
- Surveys (Tim/Mark)
- FCAL survey
- TOF survey
- ST survey
- TAGM
- TAGH
- Survey beamline component (secondary collimator, PS, beam pipe downstream the PS, etc.)
- Survey CCAL after it's installed in the Hall
- DAQ (Sergei).
- Include CDC1, ST, and CCAL crates to the readout. Power the detector, continue taking cosmic data during the detector configuration change.
- Trigger (Alex S.)
- Check physics triggers
- Run CCAL trigger when the detector is installed in the Hall
- Connect / check CCAL LED and alpha triggers
- Beam line
- Install He beam pipe between FCAL and CCAL (Tim)
- Install led shielding wall in front downstream the PS (Tim)
- Radiator status
- Check amorphous radiator
- Tagger hodoscope (A. Somov)
- Install plates with TAGH counters
- Install / check repaired TAGH countes
- Tagger microscope (Tim / Richard Jones)
- Move TAGM to the new location and rotate
- Collimator Motion (Hovanes)
- Not changed
- Active collimator detectors(Richard Jones/Alexandre Deur)
- Move active collimator to 5 mm hole
- Check
- Profiler (Hovanes)
- Not changed
- Luminosity monitor (Hovanes)
- Not changed
- Halo monitors
- Not changed
- PS system (Alex Somov)
- Not changed
- Beam line magnets (PS magnet sweeping magnet and tagger quads).
- Change filed of the PS magnet
- Polarimeter (Sebastian Cole/M. Dugger)
- Optional, not used in PrimEx
- Targets (Chris/Tim/Alexandre D.)
- LH4
- Be
- TAC (Alex Somov/Hovanes)
- Use CCAL (TAC can be used as a backup)
- Slow control (Hovanes)
- Check CCAL
- RF (Sergei)
- Not changed
- Radiation monitors (Alexandre D.)
- Not changed
- Detector systems
- ST (Beni)
- Connect cables, check dark rate
- FDC (Lubomir)
- Not changed
- CDC (Beni)
- Move CDC1 crate to the nominal position, cable up
- Check readout
- BCal (Mark D. / Elton)
- Not changed
- FCal (Mark D.)
- Check / replace bases if needed
- ComCal (Alex Somov)
- Check detector controls (Nick)
- Install CCAL platform
- Check platform motion
- Installed detector on the platform
- Connect cables
- Connect LMS
- Check detector
- TOF (Beni)
- Remove inner acrylic absorber
- ST (Beni)