Difference between revisions of "Run Planning Meeting Notes, August 3- August 10, 2022"
From GlueXWiki
(→Wednesday August 3) |
(→Wednesday August 3) |
||
Line 12: | Line 12: | ||
= Wednesday August 3 = | = Wednesday August 3 = | ||
=== Past 24 hours === | === Past 24 hours === | ||
− | * Running on empty target (60 nA). Everything is going nicely and smoothly. | + | * Running on empty target (60 nA). Everything is going nicely and smoothly: 16.6h of ABU (69% efficiency). |
=== Shift Reports === | === Shift Reports === | ||
* [https://logbooks.jlab.org/entry/4023677 Day shift summary ] | * [https://logbooks.jlab.org/entry/4023677 Day shift summary ] | ||
Line 25: | Line 25: | ||
* [https://logbooks.jlab.org/entry/4023895 Hot channel in FCAL] | * [https://logbooks.jlab.org/entry/4023895 Hot channel in FCAL] | ||
* [https://logbooks.jlab.org/entry/4024123 FMWPC Chamber 1 hot wire and trips due to high current] | * [https://logbooks.jlab.org/entry/4024123 FMWPC Chamber 1 hot wire and trips due to high current] | ||
− | * [https://logbooks.jlab.org/entry/4023804 2 ns shift] | + | * [https://logbooks.jlab.org/entry/4023804 2 ns shift fixed by Sean], [https://logbooks.jlab.org/entry/4024101 follow-up by Justin] |
+ | * [https://logbooks.jlab.org/entry/4024099 A peak at wire number 40 for FMWPC Occupancy Layer 1] appears to be [https://logbooks.jlab.org/entry/4024123 causing trips], see also [Early Riser shift summary https://logbooks.jlab.org/entry/4024097] | ||
=== Plans === | === Plans === |
Revision as of 08:11, 4 August 2022
Back to Run Coordination Meetings:Summer2022
Meeting are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)
Hall D counting room white board
Wednesday August 3
Past 24 hours
- Running on empty target (60 nA). Everything is going nicely and smoothly: 16.6h of ABU (69% efficiency).
Shift Reports
Reports
Issues
- temporary main trigger rate increase seems to be due to a hot FCal channel.
- Hot channel in FCAL
- FMWPC Chamber 1 hot wire and trips due to high current
- 2 ns shift fixed by Sean, follow-up by Justin
- A peak at wire number 40 for FMWPC Occupancy Layer 1 appears to be causing trips, see also [Early Riser shift summary https://logbooks.jlab.org/entry/4024097]
Plans
- Production running on empty target until Thursday
- Thursday morning, TAC run starting ~9am? (7-8 hours, assuming stable beam)
- RF Recovery for 4hrs on Friday to prepare for weekend. Starts at 7:15am.
- Monday day: 5 -> 4 pass change for Hall C (Around 4h. Mostly invasive).