Difference between revisions of "Run Planning Meeting Notes, July 14 - July 20, 2022"
From GlueXWiki
(→Past 24 hours) |
|||
Line 8: | Line 8: | ||
[https://docs.google.com/spreadsheets/d/1sdluzy7p5vnlhw9AWJHBrYbXKTBet45o4den4zWX9dc/edit#gid=1855021251 Spreadsheet with list of runs] | [https://docs.google.com/spreadsheets/d/1sdluzy7p5vnlhw9AWJHBrYbXKTBet45o4den4zWX9dc/edit#gid=1855021251 Spreadsheet with list of runs] | ||
+ | |||
+ | = Sunday July 18 = | ||
+ | |||
+ | === Past 24 hours === | ||
+ | |||
+ | * Production on Empty target 60 nA (~1.1 B events) | ||
+ | * Hall Access | ||
+ | ** [https://logbooks.jlab.org/entry/4016008 Inserted Pb target] (Ilya) | ||
+ | ** [https://logbooks.jlab.org/entry/4015979 Changed one FCAL base] (Malte/Mark) | ||
+ | ** [https://logbooks.jlab.org/entry/4016032 Switched SD boards between FDC crates 11 and 12] (Cody/Ben) | ||
+ | * [https://gryphn.phys.uconn.edu/halld/cobrems/harptool_2d.cgi?harp5C11_xsigma=1.288&harp5C11_xsigma_err=0.03&harp5C11_usigma=0.9475&harp5C11_usigma_err=0.03&harp5C11_ysigma=0.8761&harp5C11_ysigma_err=0.03&harp5C11B_xsigma=1.048&harp5C11B_xsigma_err=0.07&harp5C11B_usigma=0.8293&harp5C11B_usigma_err=0.06&harp5C11B_ysigma=0.8473&harp5C11B_ysigma_err=0.15&radHarp_xsigma=1.075&radHarp_xsigma_err=0.02&radHarp_usigma=1.044&radHarp_usigma_err=0.02&radHarp_ysigma=0.7626&radHarp_ysigma_err=0.02&harp5C11_spos=102.97&harp5C11B_spos=115.11&emittance_x=0.0041&radHarp_spos=119.7&emittance_y=0.00233&collimator_spos=194.92&fit=fit+and+plot Harp Scans] | ||
+ | * Production on Full Pb target 30 nA (~2.1 B events) | ||
+ | |||
+ | === Shift Reports === | ||
+ | * [https://logbooks.jlab.org/entry/4015852 Day shift summary] | ||
+ | * [https://logbooks.jlab.org/entry/4016029 Swing shift summary] | ||
+ | * [https://logbooks.jlab.org/entry/4016155 Owl shift summary] | ||
+ | * [https://logbooks.jlab.org/entry/4016232 Early Riser shift summary] | ||
+ | |||
+ | === Reports === | ||
+ | * | ||
+ | |||
+ | === Issues and Features === | ||
+ | * Stability of beam position at Active Collimator | ||
+ | * Add the TOF and CTOF trigger rates to EPICs/archiver | ||
+ | |||
+ | === Plans === | ||
+ | |||
+ | * Production data on Full Pb target | ||
= Saturday July 17 = | = Saturday July 17 = |
Revision as of 10:16, 16 July 2022
Back to Run Coordination Meetings:Summer2022
Meeting are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)
Hall D counting room white board
Sunday July 18
Past 24 hours
- Production on Empty target 60 nA (~1.1 B events)
- Hall Access
- Inserted Pb target (Ilya)
- Changed one FCAL base (Malte/Mark)
- Switched SD boards between FDC crates 11 and 12 (Cody/Ben)
- Harp Scans
- Production on Full Pb target 30 nA (~2.1 B events)
Shift Reports
Reports
Issues and Features
- Stability of beam position at Active Collimator
- Add the TOF and CTOF trigger rates to EPICs/archiver
Plans
- Production data on Full Pb target
Saturday July 17
Past 24 hours
- Production on Empty target 60 nA (~1.1 B events)
- Hall Access
- Inserted Pb target (Ilya)
- Changed one FCAL base (Malte/Mark)
- Switched SD boards between FDC crates 11 and 12 (Cody/Ben)
- Harp Scans
- Production on Full Pb target 30 nA (~2.1 B events)
Shift Reports
Reports
Issues and Features
- Stability of beam position at Active Collimator
- Add the TOF and CTOF trigger rates to EPICs/archiver
Plans
- Production data on Full Pb target
Friday July 16
Past 24 hours
- RF Recovery Day
- Productive Recovery
- Slow orbit drifts investigated. Source: changing up of a screen. Longterm solution will be implemented with long shutdown, requires vacuum work. Short-term: increase apertures, possibly this weekend.
- Restoring to more stable configuration. Delivered 70 uA to Hall C for short period and ran 48 uA overnight.
- RF trips at about 13 trips/hr.
- Maintenance
- Access to investigate DIRC environment parameters (Nick)
- Access to install crystals for testing in the PS Test Setup (Vlad and Sasha)
- DIRC Environment (Tim)
- Recycled power on BCAL LED crate (Elton/Mark)
- FCAL Base Replaced (Malte/Mark]
- Program when beam comes back
- Solenoid ramped up to 1350 A (Tim)
- Beam back about 9 pm.
- Production on Empty target 30 nA (~0.08 B events)
- Production on Empty target 60 nA (~1 B events)
Shift Reports
Reports
- Single pi0 production (Beni)
- omega signal in FCAL (Simon)
Issues and Features
- Stability of beam position at Active Collimator
- itrigger errors in monitoring plots
- Hydra not running (Naomi)
- Add the TOF and CTOF trigger rates to EPICs/archiver
Plans
- Need about 6 hours to complete present cycle on empty target.
- Insert Full Target Pb (mid afternoon)
- Change SD card in FDC crate if Cody is available.
- Harp scans
- Production
Thursday July 14
Past 24 hours
- Request for a Schedule Adjustment from Jul 27 to Aug 17 has been submitted.
- Production on Full Pb target (~0.5 B events)
- Install Empty Target (12 pm)
- Production on Empty Target (~0.9 B events). Need about twice that. After checking statistics today, I suggest we stay on Empty Target, but run at 60 nA after maintenance.
- Storm Takes Down Accelerator
- Smooth, but trippy, beam after recovery. Trips are at about 15-20 trips/hr
Shift Reports
Reports
- We would like to add the TOF and CTOF trigger rates to EPICs/archiver
Plans
- RF Recovery today (beam down 8.15 till ~5pm)
- HD Refrigerator Maintenance
- Access for Sasha and Vlad to install modules in PS Test Stand
- Nick to work on DIRC environment
- Following Maintenance: Plan to continue with Empty Target data to complete the data taking cycle and then continue at 60 nA