From GlueXWiki
(Created page with "= Meeting Time and Place == Friday April 15 2022 10:30am Hall D Counting House and Teams == Agenda == * Safety - ? * Hall D SAD Tasks Media:SAD2022_Acc_schedule.pdf ** CP...") |
(→Agenda) |
||
Line 12: | Line 12: | ||
*** Gas - Scot | *** Gas - Scot | ||
*** Helium bag [[Media:Hebag.jpg]] | *** Helium bag [[Media:Hebag.jpg]] | ||
− | |||
** PS Parasitic Detectors stages | ** PS Parasitic Detectors stages | ||
** FCAL Insert Module fabrication | ** FCAL Insert Module fabrication | ||
Line 19: | Line 18: | ||
*** cutting tool | *** cutting tool | ||
** Tagger NMR repair - Scot | ** Tagger NMR repair - Scot | ||
− | ** | + | ** Tagger controls UPS |
** BCAL Coldshot Chiller commissioning - Josh | ** BCAL Coldshot Chiller commissioning - Josh | ||
− | ** Target Turbo repair - Keith | + | ** Target/Goni Turbo repair - Keith |
** TEDF move in May to EEL stockroom area | ** TEDF move in May to EEL stockroom area | ||
− | * JT file creation | + | * JT file creation - Anthony gave presentation - file and instructions on O drive |
* FCAL Insert Drawings | * FCAL Insert Drawings | ||
* New Profiler install | * New Profiler install |
Revision as of 09:46, 15 April 2022
Meeting Time and Place =
Friday April 15 2022 10:30am Hall D Counting House and Teams
Agenda
- Safety - ?
- Hall D SAD Tasks Media:SAD2022_Acc_schedule.pdf
- CPP INstall O:\halld_engineering\Installation Schedules
- Microscope move/Hodoscope plate #7 - surveyed 4 mm high - poly shielding?
- Moveable Lead absorber - Write procedure
- Target - Bobby - need drawings
- Gas - Scot
- Helium bag Media:Hebag.jpg
- PS Parasitic Detectors stages
- FCAL Insert Module fabrication
- 40 brass straps per week needed
- matching mu metal to steel shields
- cutting tool
- Tagger NMR repair - Scot
- Tagger controls UPS
- BCAL Coldshot Chiller commissioning - Josh
- Target/Goni Turbo repair - Keith
- TEDF move in May to EEL stockroom area
- CPP INstall O:\halld_engineering\Installation Schedules
- JT file creation - Anthony gave presentation - file and instructions on O drive
- FCAL Insert Drawings
- New Profiler install
- New 3x3 CCAL for TAC Media:CPP_TAC.pdf
- Tagger Radiator Mod Media:Radiator_mod.pdf
- Controls
- Solenoid vacuum controls
- General Maintenance
- On Call - Scot
- ePAS Training and trial https://www.jlab.org/esh/epas
Action Items
- Set up next PS parasitic meeting
- Decide on Goni maintenance
- Delineate ePAS permit requests for Isolation Certificate