Difference between revisions of "March 4, 2022 Tech group SAD meeting"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
Line 12: | Line 12: | ||
*** Gas - Scot | *** Gas - Scot | ||
** Goniometer Maintenance/Diamonds - use existing diamonds - grease stage? | ** Goniometer Maintenance/Diamonds - use existing diamonds - grease stage? | ||
+ | ** FDC and Target heat exchanger - Josh | ||
** PS Parasitic Detectors stages | ** PS Parasitic Detectors stages | ||
** FCAL Insert Module fabrication | ** FCAL Insert Module fabrication |
Latest revision as of 11:26, 4 March 2022
Meeting Time and Place =
Friday March 4, 2022 10:30am Hall D Counting House and Teams
Agenda
- Safety - MEDCON status
- Hall D SAD Tasks Media:SAD2022_Acc_schedule.pdf
- CPP INstall O:\halld_engineering\Installation Schedules
- Microscope move - Bobby
- Moveable Lead absorber
- Target -
- Gas - Scot
- Goniometer Maintenance/Diamonds - use existing diamonds - grease stage?
- FDC and Target heat exchanger - Josh
- PS Parasitic Detectors stages
- FCAL Insert Module fabrication
- 40 brass straps per week needed
- Honing test a few steel shields
- Sasha wants help matching mu metal to steel shields
- Tagger NMR repair - Scot
- FDC chiller repair - Josh
- BCAL Coldshot Chiller commissioning - Josh
- Target Turbo repair - Keith
- TEDF move in late April to EEL stockroom area
- CPP INstall O:\halld_engineering\Installation Schedules
- JT file creation
- FCAL Insert Drawings
- Controls
- Solenoid vacuum controls
- General Maintenance
- On Call - Chris
- ePAS Training and trial https://www.jlab.org/esh/epas
Action Items
- Set up PS parasitic meeting
- Decide on Goni maintenance
- Delineate ePAS permit requests for CPP install HDList