Difference between revisions of "March 4, 2022 Tech group SAD meeting"
From GlueXWiki
(Created page with "= Meeting Time and Place == Friday March 4, 2022 10:30am Hall D Counting House and Teams == Agenda == * Safety - MEDCON status * Hall D SAD Tasks Media:SAD2022_Acc_schedule...") |
(→Agenda) |
||
Line 13: | Line 13: | ||
** Goniometer Maintenance/Diamonds - use existing diamonds - grease stage? | ** Goniometer Maintenance/Diamonds - use existing diamonds - grease stage? | ||
** PS Parasitic Detectors stages | ** PS Parasitic Detectors stages | ||
− | ** FCAL Insert Module fabrication | + | ** FCAL Insert Module fabrication |
+ | *** 40 brass straps per week needed | ||
+ | *** Honing test a few steel shields | ||
+ | *** Sasha wants help matching mu metal to steel shields | ||
** Tagger NMR repair - Scot | ** Tagger NMR repair - Scot | ||
** FDC chiller repair - Josh | ** FDC chiller repair - Josh | ||
Line 23: | Line 26: | ||
* Controls | * Controls | ||
** Solenoid vacuum controls | ** Solenoid vacuum controls | ||
− | + | * General Maintenance | |
* On Call - Chris | * On Call - Chris | ||
* ePAS Training and trial https://www.jlab.org/esh/epas | * ePAS Training and trial https://www.jlab.org/esh/epas |
Revision as of 10:47, 4 March 2022
Meeting Time and Place =
Friday March 4, 2022 10:30am Hall D Counting House and Teams
Agenda
- Safety - MEDCON status
- Hall D SAD Tasks Media:SAD2022_Acc_schedule.pdf
- CPP INstall O:\halld_engineering\Installation Schedules
- Microscope move - Bobby
- Moveable Lead absorber
- Target -
- Gas - Scot
- Goniometer Maintenance/Diamonds - use existing diamonds - grease stage?
- PS Parasitic Detectors stages
- FCAL Insert Module fabrication
- 40 brass straps per week needed
- Honing test a few steel shields
- Sasha wants help matching mu metal to steel shields
- Tagger NMR repair - Scot
- FDC chiller repair - Josh
- BCAL Coldshot Chiller commissioning - Josh
- Target Turbo repair - Keith
- TEDF move in late April to EEL stockroom area
- CPP INstall O:\halld_engineering\Installation Schedules
- JT file creation
- FCAL Insert Drawings
- Controls
- Solenoid vacuum controls
- General Maintenance
- On Call - Chris
- ePAS Training and trial https://www.jlab.org/esh/epas
Action Items
- Set up PS parasitic meeting
- Decide on Goni maintenance
- Delineate ePAS permit requests for CPP install HDList