Difference between revisions of "Run Planning Meeting Notes, December 2 - December 8, 2021"
From GlueXWiki
(→Thursday December 2) |
(→Thursday December 2) |
||
Line 11: | Line 11: | ||
#* run on carbon at 150nA´ | #* run on carbon at 150nA´ | ||
#* Rotate the radiators and use both configurations | #* Rotate the radiators and use both configurations | ||
− | ##* | + | ##* Stop the beam ALWAYS before changing the radiator configuration (even with the same radiator). Between radiator change (0/90 <--> 35/145) ALWAYS ask MCC to insert the dumplette. |
# Analysis update | # Analysis update |
Revision as of 08:58, 2 December 2021
Thursday December 2
- Last 24h:
- Established beam last night before midnight.
- Harp scan extrapolation looks to be focused a bit differently than before. PS rates seemed around 3.2kHz as before with 150nA beam so we kept this.
- Radiation levels at 50nA acceptable.
- Continued production on C target at 150nA. Beam not available for most of Early Riser shift so far.
- Issues:
- Plan:
- run on carbon at 150nA´
- Rotate the radiators and use both configurations
- Stop the beam ALWAYS before changing the radiator configuration (even with the same radiator). Between radiator change (0/90 <--> 35/145) ALWAYS ask MCC to insert the dumplette.
- Analysis update