Difference between revisions of "Analysis shift"
From GlueXWiki
Line 22: | Line 22: | ||
*[https://halldweb.jlab.org/wiki/images/e/e7/Rho0.pdf (γ,ρ<sup>0</sup>p) Channel Analysis] | *[https://halldweb.jlab.org/wiki/images/e/e7/Rho0.pdf (γ,ρ<sup>0</sup>p) Channel Analysis] | ||
− | === | + | === List of good production runs === |
− | + | === List of trigger configurations === | |
− | + | *FCAL_BCAL_PS_SRC_m9.conf | |
− | + | **Bit 1: FCAL (250 MeV) + BCAL (200 MeV) & ST | |
− | + | **Bit 2: FCAL (4 GeV ) + BCAL (1.3 GeV) | |
− | + | **Bit 3: PS | |
− | + |
Revision as of 17:37, 9 November 2021
Contents
Shift Schedule
- Link to shift schedule
- Shifts are 12 hours. They encouraged to be taken on site, but they may be taken remotely with connection to the Counting House.
- Responsible for checking data coming in from processing and ensuring run spreadsheet is maintained during the 12 hour shift.
- CC Room 306 is ours to use throughout the experiment for collaboration and work.
- Daily Analysis meeting at 2pm EST (CC room 326): https://bluejeans.com/773909590/1171
- Update and verify the run spreadsheet.
- Where to find information to fill the spreadsheet
- Ensure data quality run-by-run Document here
- Looking at monitoring channels and physics by run on data from batch farm. Good plots to compare with are here.
- Check plots here
- Monitoring Launch Checks: individuals contact subsystem expert for any issues: subsystem teams
- Update the run spreadsheet
- Updates to daily analysis meeting
- Keep count of events on target - add script details here
Summary Physics Shift Analysis
List of good production runs
List of trigger configurations
- FCAL_BCAL_PS_SRC_m9.conf
- Bit 1: FCAL (250 MeV) + BCAL (200 MeV) & ST
- Bit 2: FCAL (4 GeV ) + BCAL (1.3 GeV)
- Bit 3: PS