Difference between revisions of "Run Planning Meeting Notes, October 28 - November 3, 2021"
From GlueXWiki
Line 3: | Line 3: | ||
=Thursday 28 October= | =Thursday 28 October= | ||
#Last 24h: | #Last 24h: | ||
− | #* Recorded | + | #* Recorded 949M+ events |
#* [https://logbooks.jlab.org/entry/3933197 Emergency Control box intermittent alarms ] | #* [https://logbooks.jlab.org/entry/3933197 Emergency Control box intermittent alarms ] | ||
#* [https://logbooks.jlab.org/entry/3933263 TAGH scalers froze (roctagh2)]; TAGH1 and TAGH2 crates power cycled | #* [https://logbooks.jlab.org/entry/3933263 TAGH scalers froze (roctagh2)]; TAGH1 and TAGH2 crates power cycled | ||
#* Some issues with starting root spy ([https://logbooks.jlab.org/entry/3933234 see day shift summary]) | #* Some issues with starting root spy ([https://logbooks.jlab.org/entry/3933234 see day shift summary]) | ||
− | #* | + | #* 2.5hrs downtime due to issue with magnet shunt module (has been replaced) |
− | #** Chris C (target) requested access to check heater power supply of the condenser. | + | #** Chris C (target) requested access to check heater power supply of the condenser [https://logbooks.jlab.org/entry/3933441]. |
#** Our rapid access beacon is not working again ([https://logbooks.jlab.org/entry/3933422 turning, but no light!]) | #** Our rapid access beacon is not working again ([https://logbooks.jlab.org/entry/3933422 turning, but no light!]) | ||
#** RadCon escorted Chris in and out of the hall. | #** RadCon escorted Chris in and out of the hall. | ||
+ | #* | ||
#Issues: | #Issues: | ||
− | #* | + | #* Rapid access beacon |
#* Low energy tagger counters? | #* Low energy tagger counters? | ||
#* BCAL noise at 10 o'clock | #* BCAL noise at 10 o'clock |
Revision as of 07:43, 28 October 2021
MCC whiteboard Meeting Bluejeans 660743227
Thursday 28 October
- Last 24h:
- Recorded 949M+ events
- Emergency Control box intermittent alarms
- TAGH scalers froze (roctagh2); TAGH1 and TAGH2 crates power cycled
- Some issues with starting root spy (see day shift summary)
- 2.5hrs downtime due to issue with magnet shunt module (has been replaced)
- Chris C (target) requested access to check heater power supply of the condenser [1].
- Our rapid access beacon is not working again (turning, but no light!)
- RadCon escorted Chris in and out of the hall.
- Issues:
- Rapid access beacon
- Low energy tagger counters?
- BCAL noise at 10 o'clock
- Bleedthrough
- Plan:
- Continue production at 200nA with the solenoid on.
- Since Hall A cannot run at present, we are the priority hall.
- Hall C BCM calibration moved to today (Thursday) 2:30pm.