Difference between revisions of "Run Planning Meeting Notes, October 7 - October 13, 2021"
From GlueXWiki
(→Thursday, October 7) |
(→Thursday, October 7) |
||
Line 16: | Line 16: | ||
#* Target, LH2 temperature interlock not changed, https://logbooks.jlab.org/entry/3918975 (Elton) | #* Target, LH2 temperature interlock not changed, https://logbooks.jlab.org/entry/3918975 (Elton) | ||
#* LED skim, https://logbooks.jlab.org/entry/3918989 | #* LED skim, https://logbooks.jlab.org/entry/3918989 | ||
+ | #* Camera https://logbooks.jlab.org/entry/3918788 | ||
#* Bleedthrough [https://logbooks.jlab.org/entry/3918952 Different Beam structure after target change] (Tuesday evening) | #* Bleedthrough [https://logbooks.jlab.org/entry/3918952 Different Beam structure after target change] (Tuesday evening) | ||
#[https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2021.pdf Plan:] | #[https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2021.pdf Plan:] |
Revision as of 08:41, 7 October 2021
Thursday, October 7
- In last 24 hours:
- Early Riser: https://logbooks.jlab.org/entry/3919395
- Owl summary: https://logbooks.jlab.org/entry/3919305
- Swing summary: https://logbooks.jlab.org/entry/3919178
- Day summary: https://logbooks.jlab.org/entry/3918973
- Production run started at 20:58
- 0.21B triggers with hot & cold Helium empty target cell
- 0.7B triggers with He target full
- Target cooled down and filled with liquid He4
- HallD cavity BPM calibration, https://logbooks.jlab.org/entry/3919129
- Gas bottle changed, https://logbooks.jlab.org/entry/3919183 (Elton)
- Issues:
- Solenoid alarm (Amy)
- Target software, https://logbooks.jlab.org/entry/3919168 (Carlin)
- Target, LH2 temperature interlock not changed, https://logbooks.jlab.org/entry/3918975 (Elton)
- LED skim, https://logbooks.jlab.org/entry/3918989
- Camera https://logbooks.jlab.org/entry/3918788
- Bleedthrough Different Beam structure after target change (Tuesday evening)
- Plan:
- 200 nA CDC & FDC turn off (3 shifts)
- 100 nA CDC & FDC turn off (2 shifts)
- MCC will run the Moller at helicity flip rate for HallB which might disrupt HallD beam
- If Hall A is back online today (unlikely most probably tomorrow)
- Check radiation
- HARP scan
- Bleedthrough run with 100 kHz random pulser, HallD laser turn off, and no beam for 40mn