Difference between revisions of "Run Planning Meeting Notes, October 7 - October 13, 2021"
From GlueXWiki
(→Thursday, October 7) |
(→Thursday, October 7) |
||
Line 6: | Line 6: | ||
#* Day summary: https://logbooks.jlab.org/entry/3918973 | #* Day summary: https://logbooks.jlab.org/entry/3918973 | ||
#Issues: | #Issues: | ||
+ | #* Target, LH2 temperature interlock not changed, https://logbooks.jlab.org/entry/3918975 | ||
+ | #* LED skim, https://logbooks.jlab.org/entry/3918989 | ||
#* FCAL | #* FCAL | ||
#* Bleedthrough | #* Bleedthrough |
Revision as of 20:31, 6 October 2021
Thursday, October 7
- In last 24 hours:
- Early Riser:
- Owl summary:
- Swing summary: https://logbooks.jlab.org/entry/3919178
- Day summary: https://logbooks.jlab.org/entry/3918973
- Issues:
- Target, LH2 temperature interlock not changed, https://logbooks.jlab.org/entry/3918975
- LED skim, https://logbooks.jlab.org/entry/3918989
- FCAL
- Bleedthrough
- Plan:
- Before taking data: check radiation level and beam quality (HARP scan)
- 200 nA CDC & FDC turn off (5 shifts)
- 100 nA CDC & FDC turn off (2 shifts)