Line 79: | Line 79: | ||
|4.4 ||Electron beam dump|| " || 47 | |4.4 ||Electron beam dump|| " || 47 | ||
|- | |- | ||
− | |4.5 ||Beam containment and shielding || | + | |4.5 ||Beam containment and shielding || Alex || 47 |
|- | |- | ||
|5 ||Tagging spectrometer || " ||51 | |5 ||Tagging spectrometer || " ||51 |
Revision as of 09:51, 2 October 2008
- Time: 9:30 EST
- Place: EVO and ESNET (with telephone bridge)
- Connecting: instructions are here
- Present:
Agenda
- Writeups needed for the pre-brief materials packet - see below
- Tim's updated tagger hall drawings
- Relative placement of fixed array and microscope - Richard, Franz, Tim
- Resolution on tagger pole shape - Jim, Yang
- Remaining simulation studies needed for review - Richard
- Progress on simulation of the collimators - Sascha
List of documents for review pre-brief package
- The general consensus was that we should take chapter 4 in the TDR version 4 and re-write it and then use this as the core of the pre-brief material.
- A short document which summarized the recommendations from the last review and how they were resolved.
- A drawing package for the magnet needs to be provided.
- An update of the preliminary spec should be given.
- Yang's note on the TOSCA and transport studies should be included.
- Yang's report
- Dan Sober has agreed to work on improving this document.
- A description of the present status of the fixed hodoscope.
- The June R+D note on the microscope
- The pair spectrometer proposal with a few updated.
- Plan for what we want to study with diamonds.
Table of contents for Chapter4 of the TDR V4
http://argus.phys.uregina.ca/gluex/DocDB/0011/001127/002/PPS_Review08.pdf
1 | Introduction | Richard | 1 |
2 | Choice of technique | " | 3 |
2.1 | Compton back-scatter | " | 3 |
2.2 | Tagged bremsstrahlung | " | 6 |
2.3 | Coherent bremsstrahlung | " | 7 |
3 | Photon source | " | 11 |
3.1 | Essential features | " | 12 |
3.2 | Use of collimation | " | 14 |
3.3 | Choice of raditor | " | 23 |
3.4 | Crystal quality | " | 25 |
3.5 | Crystal thickness | " | 31 |
3.6 | Crystal mount | Franz | 33 |
3.7 | Crystal alignment and monitoring | Franz | 35 |
3.8 | Crystal lifetime | " | 36 |
4 | Electron beam | Jim | 39 |
4.1 | Beam polarization | " | 39 |
4.2 | Beam emittance | " | 41 |
4.3 | Electron beam line optics | " | 44 |
4.4 | Electron beam dump | " | 47 |
4.5 | Beam containment and shielding | Alex | 47 |
5 | Tagging spectrometer | " | 51 |
5.1 | Specifcations | " | 51 |
5.2 | Magnet | " | 52 |
5.3 | Spectrometer optics | " | 54 |
5.4 | Tagger detectors | Franz | 56 |
5.4.1 | Focal plane microscope detectors | Richard | 56 |
5.4.2 | Fixed focal plane array | Franz | 56 |
5.5 | Beam dump optics | Jim | 57 |
6 | Polarimetry instrumentation | Jim | 59 |
7 | Operating beam intensity | Curtis | 63 |