Difference between revisions of "Run Coordinator report: Summer 2020 w8"
From GlueXWiki
(Created page with "RC summary, 09/17/2020 - 09/21/2020, Igal Jaegle Dung the last 6 days of the beam, we took production data and carried out two tests: PS ans CCAL. # Physics production: total...") |
(No difference)
|
Revision as of 08:54, 6 October 2020
RC summary, 09/17/2020 - 09/21/2020, Igal Jaegle
Dung the last 6 days of the beam, we took production data and carried out two tests: PS ans CCAL.
- Physics production: total 18.06B - perp 8.18B para 7.86B amo 2.02B