Difference between revisions of "Sep 03, 2020 Calorimeter"
From GlueXWiki
Line 47: | Line 47: | ||
## BCAL LED | ## BCAL LED | ||
## BCAL (offline) | ## BCAL (offline) | ||
− | ## FCAL (offline) | + | ## FCAL (offline): ver16 monitoring: [https://docs.google.com/spreadsheets/d/1Y2WD53bV72FnE8REk_9tXF1ONZti69MGoO_lAHDY1jQ/edit?usp=sharing batch 5], [https://docs.google.com/spreadsheets/d/1ZApqLiRqQSsWNv7U8NmbEqvgk59LaWz69pukCbr_LY0/edit?usp=sharing batch 6], [https://docs.google.com/spreadsheets/d/1ONb17EvYKzjD6OAuVk2efRZJ2XeyqOrklEL3HufL3-U/edit?usp=sharing batch 7],[https://docs.google.com/spreadsheets/d/1sER86aAn0jOIqhD1IFDCq6viG5NgDrfHzDv3_5MbKuw/edit?usp=sharing batch 8] |
− | + | ||
# Calibration | # Calibration | ||
## [https://halldweb.jlab.org/primexd/fcal_qc/ PRIMEX-D phase 1 FCAL daily gains matching], 27 out 38 days done (the 10 missing days correspond to no beam or empty target runs) | ## [https://halldweb.jlab.org/primexd/fcal_qc/ PRIMEX-D phase 1 FCAL daily gains matching], 27 out 38 days done (the 10 missing days correspond to no beam or empty target runs) | ||
Line 59: | Line 58: | ||
= Minutes = | = Minutes = | ||
− | ''Attending:'' | + | ''Attending: Edmundo, Karthik, Varun, Zisis, Sean, Churamani, Colin, Tolga, Matt, Rebecca, Susan, Mark'' |
+ | |||
+ | # Announcements | ||
+ | ## We will look at a new day/time for this meeting as some folks have time conflicts. | ||
+ | ## MEDCON5 will continue at the lab throughout the long shutdown so at least until May. | ||
+ | # Action Items | ||
+ | ## Short term: nothing to report | ||
+ | ## Long term: data for Item 1 (FCAL LED) taken; Susan will look at it. | ||
+ | ## Calorimetty Work Packages: these will discussed and the tables wil lbe updated. | ||
+ | ### In Progress Table: | ||
+ | ###* Row 2: Karthik will use a new bggen sample to check the z-dependence. Previously there was an error in the code and this will be looked at. | ||
+ | ### Completed/Future Table: | ||
+ | # Run Update | ||
+ | ## FCAL | ||
+ | ## BCAL | ||
+ | # Monitoring | ||
+ | ## BCAL LED | ||
+ | ## BCAL (offline) | ||
+ | ## FCAL (offline) | ||
+ | # Calibration | ||
+ | ## PRIMEX-D phase 1 FCAL daily gains matching], 27 out 38 days done (the 10 missing days correspond to no beam or empty target runs) | ||
+ | ## Summer 2020 Gain Calibrations (Karthik) | ||
+ | # Efficiency: | ||
+ | # Reconstruction: nothing to report | ||
+ | # Simulations nothing to report | ||
+ | # Any other business: none |
Revision as of 11:41, 3 September 2020
Meeting Time: 11:00 a.m. JLab time
- To join via a Web Browser, go to the page [1] https://bluejeans.com/907185247.
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 907185247.
- To join via phone, use one of the following numbers and the Conference ID: 907185247.
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- Upon connection all microphones are automatically muted. To unmute your mike on a Polycom or equivalent unit, enter *4. Unmuting on a computer is trivial as there is a microphone button than can be clicked.
- More information on connecting to bluejeans is available.
Contents
Participant Direct Lines
- JLab Phone in CC L207 is 757-269-7084 (usual room)
- JLab Phone: in CC F326 is 757-269-6460
- Phone in the Regina Video-conference Suite is 306-585-4204
- Athens Phone: in Christina's office is 011-30-210-727-6947
References
- FCAL HDFCAL log book
- BCAL HDBCAL log book
- Calibrations: 2020 Data Production; RunPeriod-2019-11 Validation; Offline Monitoring Data Validation
Goals for Calorimetry Group
- Determine preliminary photon reconstruction efficiencies as a function of E, phi and theta in data and simulation with a point-to-point precision of at least 5%.
- Measure systematics of pi0/eta mass calibration as a function of detector position to a precision of at least 5 MeV.
- Demonstrate agreement of photon reconstruction efficiency and resolution between data and simulation as a function of E, phi and theta to within 5%.
Action Items
- Short term
- Hadronic split off studies
- Covariance matrices for photons
- BCAL Wiki reorganization -> All
- Long term items
- Complete Calorimeter work packages
Tentative Agenda
- Announcements
- Action Items
- Run Update
- FCAL
- BCAL
- Monitoring
- Calibration
- PRIMEX-D phase 1 FCAL daily gains matching, 27 out 38 days done (the 10 missing days correspond to no beam or empty target runs)
- Summer 2020 Gain Calibrations
- Efficiency
- Photon Efficiency Studies Planning
- Reconstruction
- Simulations
- Any other business
Minutes
Attending: Edmundo, Karthik, Varun, Zisis, Sean, Churamani, Colin, Tolga, Matt, Rebecca, Susan, Mark
- Announcements
- We will look at a new day/time for this meeting as some folks have time conflicts.
- MEDCON5 will continue at the lab throughout the long shutdown so at least until May.
- Action Items
- Short term: nothing to report
- Long term: data for Item 1 (FCAL LED) taken; Susan will look at it.
- Calorimetty Work Packages: these will discussed and the tables wil lbe updated.
- In Progress Table:
- Row 2: Karthik will use a new bggen sample to check the z-dependence. Previously there was an error in the code and this will be looked at.
- Completed/Future Table:
- In Progress Table:
- Run Update
- FCAL
- BCAL
- Monitoring
- BCAL LED
- BCAL (offline)
- FCAL (offline)
- Calibration
- PRIMEX-D phase 1 FCAL daily gains matching], 27 out 38 days done (the 10 missing days correspond to no beam or empty target runs)
- Summer 2020 Gain Calibrations (Karthik)
- Efficiency:
- Reconstruction: nothing to report
- Simulations nothing to report
- Any other business: none