Difference between revisions of "Controls Meeting 27-Jun-2024"
From GlueXWiki
Line 2: | Line 2: | ||
* Solenoid status | * Solenoid status | ||
** PXI controller test with Windows (Brian) | ** PXI controller test with Windows (Brian) | ||
− | ** New PLC controller (Josh) | + | ** New PLC controller deployment (Josh) |
** Alarm limits for solenoid PVs served by CA-server on PXI (Tim, Beni,Hovanes) | ** Alarm limits for solenoid PVs served by CA-server on PXI (Tim, Beni,Hovanes) | ||
* Power outage lessons | * Power outage lessons |
Revision as of 16:11, 20 June 2024
- Announcements
- Solenoid status
- PXI controller test with Windows (Brian)
- New PLC controller deployment (Josh)
- Alarm limits for solenoid PVs served by CA-server on PXI (Tim, Beni,Hovanes)
- Power outage lessons
- PLC developments (Bobby, Josh)
- ECAL chillers
- Chiller power
- Flow monitoring
- Dark room environment sensors
- Fan control and fan status monitoring
- ECAL HV crate resets and HV board interlocks
- EPICS screens & L5X file
- Archiving and alarms for PLC-based PVs
- ECAL chillers
- ECAL and FCAL voltage controls (Hovanes)
- Linux version for servers hosting EPICS IOC-s (Hovanes)
- Other items
Time/Location
10:00am Thursday 27-June-2024