View Issue Details [ Jump to Notes ] | [ Issue History ] [ Print ] | ||||||||
ID | Project | Category | View Status | Date Submitted | Last Update | ||||
0000228 | Hall D Online | Magnets | public | 2012-04-04 15:31 | 2013-04-03 16:22 | ||||
Reporter | wolin | ||||||||
Assigned To | stevensm | ||||||||
Priority | normal | Severity | feature | Reproducibility | N/A | ||||
Status | resolved | Resolution | fixed | ||||||
Platform | OS | OS Version | |||||||
Summary | 0000228: Repair/upgrade Danfysik power supply for solenoid test | ||||||||
Description | Implement the many fixes/improvements we determined need to be done for the Fall test. These include instrumenting for the SOE module, new ground fault detector scheme, wiring of UPS power to contactor and control boards, replace Hall C control board with our repaired board, installation of key lock box, update checkout/commissioning procedures, backup of internal board program, etc. | ||||||||
Tags | No tags attached. | ||||||||
Work by outside group for Hall D | No | ||||||||
Estimated man-weeks | 6 | ||||||||
Percentage complete | 0 | ||||||||
Actual man-weeks | 0 | ||||||||
Attached Files | |||||||||
![]() |
|
(0000369) wolin (administrator) 2012-05-09 11:37 |
Current plans are to have Bill Merz's group do routine maintenance, upgrades and repairs to the power supply in cooperation with Hall D. They can upgrade boards, upgrade firmware, etc. No need to bring in Danfysik techs. |
(0000371) stevensm (developer) 2012-05-22 11:54 |
I have marked up a "Main Schematic" print with my proposed SOE (Sequence Of Events) relays, and the change in the ground fault circuit. I am waiting for Giles Brown to go over the print with me to approve of the modifications. |
(0000505) wolin (administrator) 2013-03-25 14:48 |
Mark and folks from Accel are repairing boards, replacing power transistors, etc. Current tests look good. |
(0000507) wolin (administrator) 2013-04-03 16:22 |
The supply is ready to go. Many transistors replaced, some boards replaced (borrowed from Hall C). |
![]() |
|||
Date Modified | Username | Field | Change |
2012-04-04 15:31 | wolin | New Issue | |
2012-04-04 15:31 | wolin | Work by outside group for Hall D | => No |
2012-04-04 15:31 | wolin | Estimated man-weeks | => 6 |
2012-04-04 15:31 | wolin | Percentage complete | => 0 |
2012-04-04 15:31 | wolin | Actual man-weeks | => 0 |
2012-04-04 15:31 | wolin | Status | new => assigned |
2012-04-04 15:31 | wolin | Assigned To | => stevensm |
2012-04-23 09:22 | stevensm | Status | assigned => acknowledged |
2012-05-09 11:37 | wolin | Note Added: 0000369 | |
2012-05-22 11:54 | stevensm | Note Added: 0000371 | |
2013-03-25 14:48 | wolin | Note Added: 0000505 | |
2013-04-03 16:22 | wolin | Note Added: 0000507 | |
2013-04-03 16:22 | wolin | Status | acknowledged => resolved |
2013-04-03 16:22 | wolin | Resolution | open => fixed |