Tracking-8-18-2022

From GlueXWiki
Revision as of 14:43, 18 August 2022 by Pentchev (Talk | contribs) (Minutes)

Jump to: navigation, search
  1. meeting link to zoomgov
  2. meeting page

Thu 8/18/2022 2pm

Agenda

  1. Detector status:
    • CDC
    • FDC
  2. Tracking
  3. GEM-TRD
  4. Other

Minutes

    • CDC
      • Naomi will email Nick to ask to look at the 2 HVBs that keep tripping
      • Beni needs to do a DAQless/direct trigger checkout and then we need to get some cosmics data before the run starts, with time to spare so that we can get problems fixed.
    • FDC
    • FA125 - the transient itrig alarm at the start of runs seems to occur less frequently now.
  1. Tracking
  2. GEM-TRD
      • The two GEM trackers for the PS are ready, will discuss with Tim their installation during the downtime. For the GEM-TRD prototype the GEM foil order (from CERN) is on track, some delays with the frames from a Belgium company.
  3. Other