= Minutes =
 
= Minutes =
 +
# CDC - The max current CDC may have during the high-intensity test is 1 uA per straw, i.e. < 20 uA for the inner HV channels.
 
# FDC - the problem with half amplitudes in the FDC was solved - bad LV connector on the patch panel. Now using a spare connector but need to fix it after the end of the run.
 
# FDC - the problem with half amplitudes in the FDC was solved - bad LV connector on the patch panel. Now using a spare connector but need to fix it after the end of the run.
 
# GEM-TRD - the readout foil that was shipped from CERN to Australia finally arrived at the right destination - UVa. They will continue with the assembly of the large scale prototype beginning of February and promise to be ready second half of Feb.
 
# GEM-TRD - the readout foil that was shipped from CERN to Australia finally arrived at the right destination - UVa. They will continue with the assembly of the large scale prototype beginning of February and promise to be ready second half of Feb.

Revision as of 11:14, 26 January 2023

  1. meeting link to zoomgov
  2. meeting page

Thu 1/19/2023 2pm

Agenda

  1. Detector status:
    • CDC
    • FDC
  2. Tracking
  3. GEM-TRD
  4. Other

Minutes

  1. CDC - The max current CDC may have during the high-intensity test is 1 uA per straw, i.e. < 20 uA for the inner HV channels.
  2. FDC - the problem with half amplitudes in the FDC was solved - bad LV connector on the patch panel. Now using a spare connector but need to fix it after the end of the run.
  3. GEM-TRD - the readout foil that was shipped from CERN to Australia finally arrived at the right destination - UVa. They will continue with the assembly of the large scale prototype beginning of February and promise to be ready second half of Feb.