Topics for the 2015 Software Review

From GlueXWiki
Revision as of 13:09, 17 January 2015 by Cmeyer (Talk | contribs)

Jump to: navigation, search
  1. Report on Successful Data Challenges
    • DC1 - December 2012/ January 2013
      • 5 billion Events - OSG, JLab, CMU
      • 1200 Concurrent Jobs at JLab.
    • DC2 - March/April 2014
      • 10 billion events with EM backgrounds included - OSG, JLab, MIT, CMU, FSU
      • 4500 Concurrent Jobs at JLab
      • Well under 0.1% failure rate
    • Stealth Online Data Challenge
      • Running in Fall 2014
      • Full DAQ chain to local raid disk, transfer to tape, and automatic processing from tape.
      • ~500 million events.
    • DC3 - January/February 2015
      • Read data in raw-event format from tape and produce to DST (REST) files.
      • Load up as many JLab cores as possible.
      • Run Multi-threaded jobs
  • data acquisitions successes
    • transfer bandwidth
    • Event rates, how to improve
    • Event sizes, how to improve
    • rosbustness of system
    • Handle corrupted evio data
  • Revist data spreadsheet from a year ago
  • offline monitoring
    • browser
    • analyze data as it appears on the silo
    • reconstruction results
  • calibration committee
    • bi-weekly meeting
    • preliminary list of constants compiled
    • calibration still needs to be regularized
    • calibration database training
  • CCDB successes
    • command line interface
    • SQLite form of database
  • analysis results
    • electron identification in the FCAL.
    • pi0 peak
    • proton id with tof
    • rho meson in pi+ pi-
    • omega meson in pi+ pi- pi0
  • data transfer to CMU via globus Online
  • data management: event store, etc.
  • stealth data challenge on real data