ToF non-linearity test

From GlueXWiki
Jump to: navigation, search
  • The goal is to test the CAEN TDC in the TOF by taking data with the integral non linearity turned off for about 1 hour.
  • B. Zilmann will then will analyze the data (it may take about 2 days) to determine new parameters that then will need

to be loaded onto the CAEN TDCs.

  • Then the 1h run will be repeated with the integral non linearity correction turned on again.
  • After this, the TDCs will be restored.

This will require some coordination with the DAQ experts, as the configuration for the TOF needs to be changed.