Line 5: Line 5:
 
The agenda is not strict and should accommodate discussions
 
The agenda is not strict and should accommodate discussions
 
* General requirements for the GlueX target 10 min
 
* General requirements for the GlueX target 10 min
*# Reference to a Hall B target (Eugene)  
+
*# LH2 target 30 cm long, 2 cm diameter (for 3.4 mm collimator)
*# Geometry, power (Eugene)
+
*# Beam power in LH2 < 100 uW (high luminocity)
 
*# Hall B target adapted to Hall D: [http://www.jlab.org/~whitey/HALL_D_HYDROGEN_TARGET.pdf Hall D hydrogen target]
 
*# Hall B target adapted to Hall D: [http://www.jlab.org/~whitey/HALL_D_HYDROGEN_TARGET.pdf Hall D hydrogen target]
 +
*# Continuous vacuum from Pair Spectrometer to the target? (requirements: pressure, interlocks etc)
 
*# Solid targets (discussion)
 
*# Solid targets (discussion)
 
* Cryo supply (George) 5 min  
 
* Cryo supply (George) 5 min  

Revision as of 09:55, 17 April 2009

Meetings

2009 April 17, 10:00-11:00 F326

The agenda is not strict and should accommodate discussions

  • General requirements for the GlueX target 10 min
    1. LH2 target 30 cm long, 2 cm diameter (for 3.4 mm collimator)
    2. Beam power in LH2 < 100 uW (high luminocity)
    3. Hall B target adapted to Hall D: Hall D hydrogen target
    4. Continuous vacuum from Pair Spectrometer to the target? (requirements: pressure, interlocks etc)
    5. Solid targets (discussion)
  • Cryo supply (George) 5 min
  • General requirements to the PRIMEX target (Rory) 5 min
  • Target group view (Chris) 10 min